Worked example
Example: Day: make-up 95 t, steam 200 t, condensate 120 t, blowdown 5 %. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Make-up water metered in the period | 95.000 t |
| Steam generated | 200.00 t |
| Condensate returned | 120.00 t |
| Blowdown, share of steam (not of feedwater) | 5.0000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Unaccounted water loss | 5.0000 t |
| Unaccounted loss, share of make-up | 5.2632 % |
| Make-up that should be needed | 90.000 t |
| Condensate return, share of steam | 60.000 % |
Open this example in the calculator and change any input.
Formula
\(M_e = S - C + b\,S \qquad L = M - M_e \qquad l = \frac{L}{M} \qquad r = \frac{C}{S}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(M\) | metered make-up water | kg |
| \(S\) | steam generated | kg |
| \(C\) | condensate returned | kg |
| \(b\) | blowdown, share of steam (not of feedwater) | – |
| \(L\) | unaccounted water loss | kg |
| \(l\) | loss, share of make-up | – |
| \(M_e\) | make-up that should be needed | kg |
| \(r\) | condensate return, share of steam | – |
Method and standards
Mass balance of the steam–condensate–feedwater loop over a period.
Where it is used
- Water audits of boiler houses.
- Finding leaks and lost condensate.
- Checking make-up and condensate meters.
Common mistakes
- Counting blowdown twice (it is already in the make-up need).
- Using design condensate return instead of measured.
- Ignoring deaerator vent and soot-blowing steam.
Assumptions and limits
- Totals for the same period; no change in tank levels.
- Blowdown is a share of steam here; some sibling calculators use a share of feedwater (b_fw = b_s/(1 + b_s)).
- Every other use of water (deaerator vent, soot blowing, spray from outside the loop) shows up as unaccounted loss.
References
- Water mass balance of the boiler house
Questions and answers
How much make-up water should a boiler need?
Steam not returned plus blowdown. 200 t of steam with 120 t of condensate back and 5 % blowdown needs 90 t of make-up; if the meter shows 95 t, 5 t (5.3 %) is lost somewhere.
Where does unaccounted water go?
Leaking valves and traps, overflowing tanks, vents, soot blowing, sampling and meter error.
Why does it matter?
Every tonne of make-up costs water, treatment chemicals and the fuel to heat it; returned condensate is already hot and pure.
Method and article reviewed by FireCAD engineering on 11 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.