Phosphate Hideout from Load-Swing Data

Phosphate hiding out at high load and returning at low load, as a share of the low-load concentration and the mass held in the boiler, from load-swing samples.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationDistillery and ethanolBoiler

Inputs

Examples: Strong hideoutMild

Results

Strong hideout (above 30 %, a screening level used on this page, not from a cited standard): phosphate is depositing on hot surfaces at high heat flux; lower the phosphate level or review the treatment.

Hideout share62.500%
Phosphate hidden at high load (on the sample basis)200.00g

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Strong hideout. The inputs, in the units selected above:

InputValue
Phosphate at low load (as PO₄; same basis for both samples)8.0000 mg/L
Phosphate at high load (same basis as at low load)3.0000 mg/L
Boiler water volume40.000 m³

Applying the formula below gives:

ResultValue
Hideout share62.500 %
Phosphate hidden at high load (on the sample basis)200.00 g

Open this example in the calculator and change any input.

Formula

\(HO = \frac{c_L - c_H}{c_L}, \quad m = (c_L - c_H)V\)

Variables

Symbol Meaning SI unit
\(c_L\) Phosphate at low load (as PO₄; same basis for both samples) kg/m³
\(c_H\) Phosphate at high load (same basis as at low load) kg/m³
\(V\) Boiler water volume m³
\(HO\) Hideout share -
\(m\) Phosphate hidden at high load (on the sample basis) kg

Method and standards

Definition.

Where it is used

  • Chemistry troubleshooting.

Common mistakes

  • Dosing changed between samples.

Assumptions and limits

  • Steady dosing and blowdown.
  • Both samples on the same basis (as PO₄ or as P); the share does not depend on the basis, the mass is on that basis.
  • If the high-load phosphate is the higher, there is no hideout: the share comes out negative and the hidden mass is not shown.
  • The 30 % mark for strong hideout is a screening level used on this page, not a cited limit.

References

  • Definition on load-swing data (same blowdown and dosing conditions)

Questions and answers

What is hideout?

Phosphate precipitates on high-heat-flux tubes at high load and redissolves when load falls.

Why is it a problem?

It upsets control and can leave acid phosphate deposits under which corrosion occurs.

Test?

Hold dosing and blowdown steady and sample at low and high load.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.