Example: Illustrative 108 m2 pool, 5 MW, 40 C. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Decay heat in the pool | 5.0000 MW |
| Pool water surface area | 108.00 m² |
| Total water depth | 12.000 m |
| Water depth above the top of the fuel | 7.0000 m |
| Initial pool temperature | 40.000 °C |
| Pressure at the pool surface | 101.33 kPa |
| Fraction of the pool volume taken by racks and fuel | 20.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Water mass | 1,178.8 t |
| Time to boil | 16.461 h |
| Boil-off rate | 7,976.8 kg/h |
| Level fall while boiling | 0.077067 m/h |
| Time from boiling until the water reaches the top of the fuel | 90.829 h |
| Total time to uncover the fuel | 107.29 h |
Open this example in the calculator and change any input.
Formula
\(t_b = \frac{m_w(h_f - h_0)}{Q}, \quad \dot m_b = \frac{Q}{h_{fg}}, \quad t_u = \frac{H_a\rho_fA}{\dot m_b}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(Q\) | Decay heat in the pool | W |
| \(A\) | Pool water surface area | m² |
| \(H\) | Total water depth | m |
| \(H_a\) | Water depth above the top of the fuel | m |
| \(T_0\) | Initial pool temperature | K |
| \(p\) | Pressure at the pool surface | Pa |
| \(\phi\) | Fraction of the pool volume taken by racks and fuel | - |
| \(m_w\) | Water mass | kg |
| \(t_b\) | Time to boil | s |
| \(\dot m_b\) | Boil-off rate | kg/s |
| \(\dot z\) | Level fall while boiling | m/s |
| \(t_u\) | Time from boiling until the water reaches the top of the fuel | s |
| \(t_b + t_u\) | Total time to uncover the fuel | s |
Method and standards
Pool energy balance.
Where it is used
- Loss-of-cooling response planning.
- Outage planning for full-core offloads.
Common mistakes
- Using the full-power decay heat long after shutdown.
- Ignoring the racks' displacement of water.
Assumptions and limits
- Adiabatic and well mixed; no make-up or heat loss.
References
- Adiabatic heat-up and boil-off energy balance
Questions and answers
How long does a pool take to boil?
Typically from several hours just after a full-core offload to days for an old inventory; this sets the time available to restore cooling.
What boil-off does 1 MW give?
About 1.6 t of water per hour (h_fg about 2,257 kJ/kg at atmospheric pressure).
What do the defaults represent?
An illustrative pool of 108 m² with 12 m of water (7 m above the fuel, racks taking 20 % of the lower 5 m), 5 MW of decay heat and water at 40 °C.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Todreas and Kazimi, Nuclear Systems I: Thermal Hydraulic Fundamentals (Hemisphere, 1990), ch. 6