FireCADCalc

Half-Life from Two Count-Rate Measurements

Decay constant, half-life and mean life from two background-corrected count rates taken some time apart, with the counting-statistics uncertainty.

Thermal power plant

Inputs

Examples: Illustrative 1200 then 455 cpm after 5 hShort-lived 5000 to 1250 cps in 10 minLong-lived 800 to 780 cpm over 30 days

Accepted: 0.06 to 6E+10 1/min
Accepted: 0.06 to 6E+10 1/min
Accepted: 0 to 60,000,000 1/min
Accepted: 2.778E-7 to 2,777,800 h
Accepted: 0.0016667 to 166,670 min

Results

λ = ln[(C₁ − B)/(C₂ − B)]/Δt. Uncertainty from Poisson statistics with the background counted for the same time; dead-time losses at high rates and detector drift are not corrected. Measure over at least one half-life for a useful result.

Decay constant0.199581/h
Half-life3.4729h
Mean life5.0104h
Relative standard uncertainty of the half-life0.23807%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 1200 then 455 cpm after 5 h. The inputs, in the units selected above:

InputValue
First gross count rate1,200.0 1/min
Second gross count rate455.00 1/min
Background count rate20.000 1/min
Time between the measurements5.0000 h
Counting time of each measurement10.000 min

Applying the formula below gives:

ResultValue
Decay constant0.19958 1/h
Half-life3.4729 h
Mean life5.0104 h
Relative standard uncertainty of the half-life1.8441 %

Open this example in the calculator and change any input.

Formula

\(\lambda = \frac{1}{\Delta t}\ln\frac{C_1 - B}{C_2 - B}, \quad T_{1/2} = \frac{\ln 2}{\lambda}\)

Variables

Symbol Meaning SI unit
\(C_1\) First gross count rate 1/s
\(C_2\) Second gross count rate 1/s
\(B\) Background count rate 1/s
\(\Delta t\) Time between the measurements s
\(t_c\) Counting time of each measurement s
\(\lambda\) Decay constant 1/s
\(T_{1/2}\) Half-life s
\(\tau\) Mean life s
\(u_{T_{1/2}}/T_{1/2}\) Relative standard uncertainty of the half-life -

Method and standards

Half-life measurement.

Where it is used

  • Identifying an unknown radionuclide.
  • Teaching laboratory radioactivity.

Common mistakes

  • Forgetting background.
  • Using rates in different time units.

Assumptions and limits

  • Single nuclide; no dead-time correction.

References

  • Exponential decay fitted to two net count rates with Poisson statistics

Questions and answers

Why subtract background?

The detector counts natural radiation all the time; leaving it in makes the source appear to decay more slowly.

How can the result be made more precise?

Count longer, wait longer between measurements (at least one half-life) and use a stronger source relative to background.

What do the defaults represent?

An illustrative source counting 1,200 then 455 counts per minute five hours later, background 20 per minute, 10-minute counts.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Lamarsh and Baratta, Introduction to Nuclear Engineering, 3rd ed. (Prentice Hall, 2001), ch. 2

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.