Worked example
Example: Illustrative 1000 kg at 4.5 %, tails 0.25 %. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Enriched product mass | 1,000.0 kg |
| Product assay (U-235) | 4.5000 % |
| Feed assay (natural 0.711 %) | 0.71100 % |
| Tails assay | 0.25000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Feed mass | 9,219.1 kg |
| Tails mass | 8,219.1 kg |
| Separative work (kg-SWU) | 6,871.1 |
| Separative work per kg of product | 6.8711 |
| Feed per kg of product | 9.2191 |
| Fraction of the feed U-235 recovered in the product | 68.652 % |
Open this example in the calculator and change any input.
Formula
\(F = P\frac{x_p - x_t}{x_f - x_t}, \quad SWU = PV(x_p) + TV(x_t) - FV(x_f), \quad V(x) = (2x - 1)\ln\frac{x}{1 - x}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(P\) | Enriched product mass | kg |
| \(x_p\) | Product assay (U-235) | - |
| \(x_f\) | Feed assay (natural 0.711 %) | - |
| \(x_t\) | Tails assay | - |
| \(F\) | Feed mass | kg |
| \(T\) | Tails mass | kg |
| \(SWU\) | Separative work (kg-SWU) | - |
| \(SWU/P\) | Separative work per kg of product | - |
| \(F/P\) | Feed per kg of product | - |
| \(\eta_{235}\) | Fraction of the feed U-235 recovered in the product | - |
Method and standards
Enrichment cascade value function.
Where it is used
- Fuel procurement and cost estimates.
- Teaching the nuclear fuel cycle.
Common mistakes
- Using weight per cent of UF₆ instead of uranium mass.
- Mixing assays in per cent and fractions.
Assumptions and limits
- Ideal cascade value function; uranium masses (not UF₆).
References
- Enrichment mass balance and the separative work value function
Questions and answers
How much natural uranium makes 1 kg of 4.5 % fuel?
About 9.2 kg at 0.25 % tails, using about 6.9 SWU.
Why choose a higher tails assay?
When SWU is expensive relative to uranium it is cheaper to leave more U-235 in the tails and buy more feed.
What do the defaults represent?
An illustrative 1,000 kg of 4.5 % enriched uranium from natural feed (0.711 %) with 0.25 % tails.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Lamarsh and Baratta, Introduction to Nuclear Engineering, 3rd ed. (Prentice Hall, 2001), ch. 4