Uranium Ore, U3O8 and Mill Recovery

Ore tonnage and U3O8 mass needed to supply an amount of natural uranium from the ore grade and mill recovery, with uranium per tonne of ore.

Thermal power plant

Inputs

Examples: Illustrative 180 t U from 0.2 % oreHigh grade 12 %Low grade 0.05 %

Accepted: 0.001 to 1,000,000 t
Accepted: 0.001 to 30 %
Accepted: 30 to 100 %

Results

U₃O₈ contains 84.8 % uranium by mass (natural uranium 238.029 g/mol); ore = U₃O₈/(grade × recovery). Grades range from under 0.05 % to over 10 % in Canadian deposits; in-situ leach mines report differently.

U₃O₈ to uranium mass ratio1.1792
U₃O₈ produced212.26t
Ore mined and milled117,924t
Uranium recovered per tonne of ore (kg)1.5264

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 180 t U from 0.2 % ore. The inputs, in the units selected above:

InputValue
Natural uranium needed180.00 t
Ore grade (U₃O₈ by mass)0.20000 %
Mill recovery90.000 %

Applying the formula below gives:

ResultValue
U₃O₈ to uranium mass ratio1.1792
U₃O₈ produced212.26 t
Ore mined and milled117,924 t
Uranium recovered per tonne of ore (kg)1.5264

Open this example in the calculator and change any input.

Formula

\(\frac{m_{U_3O_8}}{m_U} = \frac{3M_U + 8M_O}{3M_U}, \quad m_{ore} = \frac{m_{U_3O_8}}{gR}\)

Variables

Symbol Meaning SI unit
\(m_U\) Natural uranium needed kg
\(g\) Ore grade (U₃O₈ by mass) -
\(R\) Mill recovery -
\(m_{U_3O_8}/m_U\) U₃O₈ to uranium mass ratio -
\(m_{U_3O_8}\) U₃O₈ produced kg
\(m_{ore}\) Ore mined and milled kg
\(m_U/m_{ore}\) Uranium recovered per tonne of ore (kg) -

Method and standards

Ore balance.

Where it is used

  • Fuel supply and mining studies.
  • Teaching the fuel cycle.

Common mistakes

  • Mixing grades in U and U₃O₈.
  • Forgetting mill recovery.

Assumptions and limits

  • Natural uranium; mass basis.

References

  • Uranium front-end mass balance

Questions and answers

How much ore feeds a reactor for a year?

About 180 t of natural uranium for a large reactor, which at 0.2 % grade and 90 % recovery is roughly 120,000 t of ore.

What is yellowcake?

The mill product, mostly U₃O₈ (84.8 % uranium by mass), which is then converted to UF₆ for enrichment.

What do the defaults represent?

An illustrative 180 t of natural uranium from 0.2 % U₃O₈ ore with 90 % mill recovery.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Lamarsh and Baratta, Introduction to Nuclear Engineering, 3rd ed. (Prentice Hall, 2001), ch. 4

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.