Reactor Annual Fuel, Natural Uranium and SWU Needs

Heavy metal loaded per year, natural uranium feed and separative work for a reactor from its electrical output, efficiency, capacity factor, burn-up and enrichment.

Thermal power plant

Inputs

Examples: Illustrative 1000 MWe, 4.5 %, 50 GWd/t1600 MWe EPR-like, 5 %, 60 GWd/tSMR 77 MWe, 4.95 %, 35 GWd/t

Accepted: 1 to 3,000 MW
Accepted: 20 to 50 %
Accepted: 10 to 100 %
Accepted: 10 to 115.74 GWd/t
Accepted: 0.8 to 20 %
Accepted: 0.05 to 0.7 %

Results

Heavy metal = thermal energy/burn-up (equilibrium cycle); feed and SWU per kg product from the enrichment mass balance and value function at 0.711 % natural assay.

Thermal energy per year2,068.5GWh
Heavy metal loaded per year2.4625t
Natural uranium feed per year25.106t
Separative work per year (kg-SWU)19,251
U-235 in the fresh fuel121.89kg

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 1000 MWe, 4.5 %, 50 GWd/t. The inputs, in the units selected above:

InputValue
Net electrical output1,000.0 MW
Net efficiency33.000 %
Capacity factor90.000 %
Discharge burn-up50.000 GWd/t
Enrichment4.5000 %
Tails assay0.25000 %

Applying the formula below gives:

ResultValue
Thermal energy per year23,907 GWh
Heavy metal loaded per year19.923 t
Natural uranium feed per year183.67 t
Separative work per year (kg-SWU)136,891
U-235 in the fresh fuel896.52 kg

Open this example in the calculator and change any input.

Formula

\(m_{HM} = \frac{P_e\,CF\,t}{\eta\,BU}, \quad m_F = m_{HM}\frac{x_p - x_t}{x_f - x_t}\)

Variables

Symbol Meaning SI unit
\(P_e\) Net electrical output W
\(\eta\) Net efficiency -
\(CF\) Capacity factor -
\(BU\) Discharge burn-up J/kg
\(x_p\) Enrichment -
\(x_t\) Tails assay -
\(E_{th}\) Thermal energy per year J
\(m_{HM}\) Heavy metal loaded per year kg
\(m_F\) Natural uranium feed per year kg
\(SWU\) Separative work per year (kg-SWU) -
\(m_{235}\) U-235 in the fresh fuel kg

Method and standards

Annual fuel balance.

Where it is used

  • Fuel procurement planning.
  • Comparing reactor fuel strategies.

Common mistakes

  • Using thermal instead of electrical rating.
  • Forgetting the capacity factor.

Assumptions and limits

  • Equilibrium cycle; uranium fuel only.

References

  • Equilibrium-cycle fuel balance with enrichment

Questions and answers

How much uranium does a 1,000 MW reactor use?

About 20 t of enriched fuel a year at 50 GWd/t, made from roughly 180–200 t of natural uranium.

Why does higher burn-up help?

It extracts more energy per tonne loaded, so fewer assemblies are needed each year, though each needs more enrichment.

What do the defaults represent?

An illustrative 1,000 MWe plant at 33 % and 90 % capacity factor with 4.5 % fuel to 50 GWd/t and 0.25 % tails.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Lamarsh and Baratta, Introduction to Nuclear Engineering, 3rd ed. (Prentice Hall, 2001), ch. 4

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.