Example: Illustrative 1000 MWe, 4.5 %, 50 GWd/t. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Net electrical output | 1,000.0 MW |
| Net efficiency | 33.000 % |
| Capacity factor | 90.000 % |
| Discharge burn-up | 50.000 GWd/t |
| Enrichment | 4.5000 % |
| Tails assay | 0.25000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Thermal energy per year | 23,907 GWh |
| Heavy metal loaded per year | 19.923 t |
| Natural uranium feed per year | 183.67 t |
| Separative work per year (kg-SWU) | 136,891 |
| U-235 in the fresh fuel | 896.52 kg |
Open this example in the calculator and change any input.
Formula
\(m_{HM} = \frac{P_e\,CF\,t}{\eta\,BU}, \quad m_F = m_{HM}\frac{x_p - x_t}{x_f - x_t}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(P_e\) | Net electrical output | W |
| \(\eta\) | Net efficiency | - |
| \(CF\) | Capacity factor | - |
| \(BU\) | Discharge burn-up | J/kg |
| \(x_p\) | Enrichment | - |
| \(x_t\) | Tails assay | - |
| \(E_{th}\) | Thermal energy per year | J |
| \(m_{HM}\) | Heavy metal loaded per year | kg |
| \(m_F\) | Natural uranium feed per year | kg |
| \(SWU\) | Separative work per year (kg-SWU) | - |
| \(m_{235}\) | U-235 in the fresh fuel | kg |
Method and standards
Annual fuel balance.
Where it is used
- Fuel procurement planning.
- Comparing reactor fuel strategies.
Common mistakes
- Using thermal instead of electrical rating.
- Forgetting the capacity factor.
Assumptions and limits
- Equilibrium cycle; uranium fuel only.
References
- Equilibrium-cycle fuel balance with enrichment
Questions and answers
How much uranium does a 1,000 MW reactor use?
About 20 t of enriched fuel a year at 50 GWd/t, made from roughly 180–200 t of natural uranium.
Why does higher burn-up help?
It extracts more energy per tonne loaded, so fewer assemblies are needed each year, though each needs more enrichment.
What do the defaults represent?
An illustrative 1,000 MWe plant at 33 % and 90 % capacity factor with 4.5 % fuel to 50 GWd/t and 0.25 % tails.