Nuclear Fuel Cost per MWh from the Front-End Cycle

Front-end fuel cost of enriched uranium per kg and per MWh of electricity from uranium, conversion, enrichment (SWU) and fabrication prices, burn-up and efficiency.

Thermal power plant

Inputs

Examples: Illustrative 4.5 %, 150 U, 160 SWU, 50 GWd/tCheap uranium 80, 3.5 %, 40 GWd/tHigh burn-up 5 %, 60 GWd/t, tails 0.2 %

Accepted: 0.8 to 20 %
Accepted: 0.05 to 0.7 %
Accepted: 0 to 1,000
Accepted: 0 to 200
Accepted: 0 to 500
Accepted: 0 to 2,000
Accepted: 10 to 115.74 GWd/t
Accepted: 20 to 50 %

Results

Per kg of enriched uranium: F/P(c_U + c_conv) + (SWU/P)c_SWU + c_fab, with feed at natural assay 0.711 % and the ideal-cascade value function. Electricity per kg = BU·η. Back-end costs (storage, disposal, interest on inventory) are excluded; they typically add 1–3 per MWh.

Natural uranium feed per kg of product9.2191
Separative work per kg of product6.8711
Cost per kg of enriched uranium in fuel3,112.7
Electricity per kg of uranium in fuel396.00MWh
Front-end fuel cost per MWh of electricity7.8604
Share of uranium purchase in the cost44.426%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 4.5 %, 150 U, 160 SWU, 50 GWd/t. The inputs, in the units selected above:

InputValue
Product enrichment4.5000 %
Tails assay0.25000 %
Natural uranium price per kg U (as U₃O₈ content)150.00 -
Conversion price per kg U25.000 -
Enrichment price per SWU160.00 -
Fabrication price per kg of enriched U400.00 -
Discharge burn-up50.000 GWd/t
Net plant efficiency33.000 %

Applying the formula below gives:

ResultValue
Natural uranium feed per kg of product9.2191
Separative work per kg of product6.8711
Cost per kg of enriched uranium in fuel3,112.7
Electricity per kg of uranium in fuel396.00 MWh
Front-end fuel cost per MWh of electricity7.8604
Share of uranium purchase in the cost44.426 %

Open this example in the calculator and change any input.

Formula

\(c_{kg} = \frac{F}{P}(c_U + c_{conv}) + \frac{SWU}{P}c_{SWU} + c_{fab}, \quad c_{MWh} = \frac{c_{kg}}{BU\cdot\eta}\)

Variables

Symbol Meaning SI unit
\(x_p\) Product enrichment -
\(x_t\) Tails assay -
\(c_U\) Natural uranium price per kg U (as U₃O₈ content) -
\(c_{conv}\) Conversion price per kg U -
\(c_{SWU}\) Enrichment price per SWU -
\(c_{fab}\) Fabrication price per kg of enriched U -
\(BU\) Discharge burn-up J/kg
\(\eta\) Net plant efficiency -
\(F/P\) Natural uranium feed per kg of product -
\(SWU/P\) Separative work per kg of product -
\(c_{kg}\) Cost per kg of enriched uranium in fuel -
\(E_e\) Electricity per kg of uranium in fuel J
\(c_{MWh}\) Front-end fuel cost per MWh of electricity -
\(c_U F/c_{kg}\) Share of uranium purchase in the cost -

Method and standards

Front-end fuel cost.

Where it is used

  • Fuel procurement and generating cost estimates.
  • Comparing enrichment and tails options.

Common mistakes

  • Pricing uranium per kg of U₃O₈ instead of U.
  • Using thermal instead of electrical MWh.

Assumptions and limits

  • Front end only; no carrying charges or back-end costs.

References

  • Front-end fuel cycle cost with the separative work value function

Questions and answers

How much does nuclear fuel cost per MWh?

About 5–10 per MWh of electricity at recent prices, a small share of total generating cost; uranium itself is roughly half of it.

Why does burn-up matter?

Higher burn-up gets more energy from each kilogram of fabricated, enriched fuel, cutting the fuel cost per MWh.

What do the defaults represent?

Illustrative prices: uranium 150 and conversion 25 per kg U, 160 per SWU, fabrication 400 per kg, 4.5 % fuel with 0.25 % tails, 50 GWd/t and 33 % efficiency.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Lamarsh and Baratta, Introduction to Nuclear Engineering, 3rd ed. (Prentice Hall, 2001), ch. 4

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.