Worked example
Example: Laser 6 m of cut. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Total cut length | 6.0000 m |
| Cutting speed | 3.0000 m/min |
| Number of pierces | 12.000 - |
| Time per pierce | 1.5000 s |
| Rapid travel length | 4.0000 m |
| Rapid speed | 60.000 m/min |
| Machine rate per hour | 3,000.0 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Total time | 2.3667 min |
| Cost | 118.33 |
Open this example in the calculator and change any input.
Formula
\(t = \frac{L}{v} + n_p t_p + \frac{L_r}{v_r}, \quad C = \frac{t\,c}{3600\ \mathrm{s/h}}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(L\) | Total cut length | m |
| \(v\) | Cutting speed | m/s |
| \(n_p\) | Number of pierces | - |
| \(t_p\) | Time per pierce | s |
| \(L_r\) | Rapid travel length | m |
| \(v_r\) | Rapid speed | m/s |
| \(c\) | Machine rate per hour | - |
| \(t\) | Total time | s |
| \(C\) | Cost | - |
Method and standards
Time sum.
Where it is used
- Fabrication quotes.
- Nesting decisions.
Common mistakes
- Chart speed on small contours.
- Ignoring pierces.
Assumptions and limits
- Constant speeds: no acceleration or slow-down on corners and small contours (a note reminds of this).
References
- t = L/v + n_p t_p + L_r/v_r
Questions and answers
6 m of cut at 3 m/min, 12 pierces of 1.5 s, 4 m of rapids?
About 2.37 min: 118 at 3000 per hour.
Thick plate?
Pierce time rises steeply; plan fewer pierces with common-line cutting.
Acceleration?
Small features cut below the chart speed; add a margin.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.