Worked example
Example: 8 h shift. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Planned production time | 480.00 min |
| Downtime (stops) | 50.000 min |
| Ideal cycle time per part | 6.0000 s |
| Total parts made | 4,200.0 - |
| Good parts | 4,080.0 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Availability | 89.583 % |
| Performance | 97.674 % |
| Quality | 97.143 % |
| OEE = A × P × Q | 85.000 % |
Open this example in the calculator and change any input.
Formula
\(A = \frac{t_p - t_d}{t_p}, \quad P = \frac{t_c N}{t_p - t_d}, \quad Q = \frac{N_g}{N}, \quad OEE = APQ\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(t_p\) | Planned production time | s |
| \(t_d\) | Downtime (stops) | s |
| \(t_c\) | Ideal cycle time per part | s |
| \(N\) | Total parts made | - |
| \(N_g\) | Good parts | - |
| \(A\) | Availability | - |
| \(P\) | Performance | - |
| \(Q\) | Quality | - |
| \(OEE\) | OEE = A × P × Q | - |
Method and standards
TPM definition.
Where it is used
- Shop-floor performance tracking.
- Improvement projects.
Common mistakes
- Ideal cycle time set too slow.
- Excluding planned stops inconsistently.
Assumptions and limits
- One machine or line.
References
- OEE = Availability × Performance × Quality (Nakajima, TPM)
Questions and answers
8 h shift, 50 min down, 6 s cycle, 4200 made, 4080 good?
A 89.6 %, P 97.7 %, Q 97.1 %: OEE 85.0 %.
World-class?
Often quoted near 85 %, but compare like with like.
Biggest lever?
Usually availability: changeovers and breakdowns.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.