Worked example
Example: 12 000 a year. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Annual demand (units) | 12,000 - |
| Cost per order or set-up | 2,500.0 - |
| Holding cost per unit per year | 40.000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Economic order quantity | 1,224.7 |
| Orders per year | 9.7980 |
| Annual ordering plus holding cost | 48,990 |
Open this example in the calculator and change any input.
Formula
\(Q^* = \sqrt{\frac{2DS}{H}}, \quad C = \frac{D}{Q}S + \frac{Q}{2}H\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(D\) | Annual demand (units) | - |
| \(S\) | Cost per order or set-up | - |
| \(H\) | Holding cost per unit per year | - |
| \(Q^*\) | Economic order quantity | - |
| \(N\) | Orders per year | - |
| \(C\) | Annual ordering plus holding cost | - |
Method and standards
Harris–Wilson.
Where it is used
- Stores and consumables.
- Batch planning.
Common mistakes
- Holding cost per month with annual demand.
- Ignoring quantity discounts.
Assumptions and limits
- Steady demand, instant replenishment.
References
- Harris (1913)/Wilson EOQ Q* = √(2DS/H)
Questions and answers
12,000 a year, 2500 per order, 40 per unit-year?
EOQ about 1225: 9.8 orders a year.
Spares for a plant?
Critical spares follow risk, not EOQ.
Production batches?
Use set-up cost as S: the economic batch quantity.