Worked example
Example: Carbide inserts. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Taylor exponent | 0.25000 - |
| Taylor constant: cutting speed for a 1-minute tool life | 400.00 m/min |
| Machine and labour cost per minute | 15.000 - |
| Tool cost per cutting edge | 120.00 - |
| Tool change time | 2.0000 min |
Applying the formula below gives:
| Result | Value |
|---|---|
| Tool life for minimum cost | 30.000 min |
| Speed for minimum cost | 170.91 m/min |
| Tool life for maximum production | 6.0000 min |
| Speed for maximum production | 255.58 m/min |
Open this example in the calculator and change any input.
Formula
\(T_{cost} = \left(\frac{1}{n} - 1\right)\left(t_c + \frac{C_t}{C_o}\right), \quad T_{prod} = \left(\frac{1}{n} - 1\right)t_c, \quad V = \frac{C}{T^n}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(n\) | Taylor exponent | - |
| \(C\) | Taylor constant: cutting speed for a 1-minute tool life | m/s |
| \(C_o\) | Machine and labour cost per minute | - |
| \(C_t\) | Tool cost per cutting edge | - |
| \(t_c\) | Tool change time | s |
| \(T_{cost}\) | Tool life for minimum cost | s |
| \(V_{cost}\) | Speed for minimum cost | m/s |
| \(T_{prod}\) | Tool life for maximum production | s |
| \(V_{prod}\) | Speed for maximum production | m/s |
Method and standards
Gilbert.
Where it is used
- Setting CNC speeds.
- Tooling decisions.
Common mistakes
- Cost per edge vs per insert.
- Times in seconds with constants in minutes.
Assumptions and limits
- Taylor law holds, V Tⁿ = C with T in minutes: C is the cutting speed for a 1-minute tool life (enter it in any speed unit; a constant fitted with T in seconds must be converted first, C_min = C_s × 60ⁿ).
- The tool change time must be above zero: with zero the maximum-production speed is unbounded.
References
- Machining economics (Gilbert): T_cost = (1/n − 1)(t_c + C_t/C_o)
- T_prod = (1/n − 1)t_c (Kalpakjian; Groover)
Questions and answers
n 0.25, C 400, 15 per min, tool 120, 2 min change?
Minimum cost at T = 30 min, 171 m/min; maximum production at T = 6 min, 256 m/min.
Why is the production speed higher?
It ignores tool cost and only weighs change time.
Cheap inserts?
Lower tool cost pushes the economic speed up.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.