Worked example
Example: Three hoods 1.5 × 0.5 m. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Sash opening width | 1.5000 m |
| Sash opening height | 0.50000 m |
| Face velocity | 0.50000 m/s |
| Number of hoods | 3.0000 - |
| Laboratory volume | 300.00 m³ |
Applying the formula below gives:
| Result | Value |
|---|---|
| Exhaust per hood | 1,350.0 m³/h |
| Total exhaust | 4,050.0 m³/h |
| Air changes per hour from the hoods | 13.500 |
Open this example in the calculator and change any input.
Formula
\(\dot V = n W H v_f, \quad ACH = \frac{3600 \dot V}{V_r}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(W\) | Sash opening width | m |
| \(H\) | Sash opening height | m |
| \(v_f\) | Face velocity | m/s |
| \(n\) | Number of hoods | - |
| \(V_r\) | Laboratory volume | m³ |
| \(\dot V_1\) | Exhaust per hood | m³/s |
| \(\dot V\) | Total exhaust | m³/s |
| \(ACH\) | Air changes per hour from the hoods | - |
Method and standards
Continuity.
Where it is used
- Water and fuel laboratories in power plants.
- QC labs.
Common mistakes
- No make-up air.
- Full sash when it is normally half-closed.
Assumptions and limits
- Uniform face velocity.
References
- Continuity Q = W H v_f
Questions and answers
1.5 × 0.5 m sash at 0.5 m/s, three hoods?
About 1,350 m³/h each, 4,050 m³/h in all: 13.5 air changes in 300 m³.
Why not just raise the velocity?
Too high causes turbulence that can pull fumes out.
Water and boiler labs?
Use hoods for acid digestion and solvent work.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.