FireCADCalc

DM Plant Sizing (Cation and Anion Resin, Regenerant)

Cation and anion resin volumes and acid and caustic per regeneration for a two-bed demineralisation (DM) plant from flow, run time, ionic load and resin capacities.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationChemical and fertiliserBoilerWater treatment plant

Inputs

Examples: 20 m³/h, 20 h, cations 300, anions 280 mg/L as CaCO35 m³/h, 16 h, 450 / 42050 m³/h, 24 h, 150 / 160

From the resin maker's data at your regenerant dose.

Results

Cation resin volume2,400.0L
Anion resin volume3,200.0L
Acid per regeneration (100 % HCl)192.00kg
Caustic per regeneration (100 % NaOH)224.00kg
Water treated per run400.00m³

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 20 m³/h, 20 h, cations 300, anions 280 mg/L as CaCO3. The inputs, in the units selected above:

InputValue
Treated water flow (net output; regeneration and rinse water not deducted)20.000 m³/h
Run time between regenerations20.000 h
Total cations to remove, as CaCO₃300.00 mg/L
Total anions to remove (with CO₂ and silica if no degasser), as CaCO₃280.00 mg/L
Cation resin operating capacity, as CaCO₃50.000 g/L
Anion resin operating capacity, as CaCO₃35.000 g/L
Acid dose per litre of cation resin (as 100 % HCl)80.000 g/L
Caustic dose per litre of anion resin (as 100 % NaOH)70.000 g/L

Applying the formula below gives:

ResultValue
Cation resin volume2,400.0 L
Anion resin volume3,200.0 L
Acid per regeneration (100 % HCl)192.00 kg
Caustic per regeneration (100 % NaOH)224.00 kg
Water treated per run400.00 m³

Open this example in the calculator and change any input.

Formula

\(V_w = \dot V\,t_r \qquad V_c = \frac{V_w\,C_c}{Q_c} \qquad V_a = \frac{V_w\,C_a}{Q_a} \qquad m_{HCl} = V_c\,d_{HCl} \qquad m_{NaOH} = V_a\,d_{NaOH}\)

Variables

Symbol Meaning SI unit
\(\dot V\) treated water flow (net output) m³/s
\(t_r\) run time s
\(C_c\) total cations as CaCO₃ kg/m³
\(C_a\) total anions as CaCO₃ kg/m³
\(Q_c\) cation resin operating capacity kg/m³
\(Q_a\) anion resin operating capacity kg/m³
\(d_{HCl}\) acid dose per volume of cation resin kg/m³
\(d_{NaOH}\) caustic dose per volume of anion resin kg/m³
\(V_c\) cation resin volume m³
\(V_a\) anion resin volume m³
\(m_{HCl}\) acid per regeneration (100 %) kg
\(m_{NaOH}\) caustic per regeneration (100 %) kg
\(V_w\) water treated per run m³

Method and standards

Mass balance of each ion-exchange bed; capacities and regenerant doses are the resin maker's data for your water and regeneration level.

Where it is used

  • Sizing DM plants for high-pressure boiler make-up.
  • Estimating acid and caustic consumption.
  • Checking run length after a change in raw water or RO pre-treatment.

Common mistakes

  • Leaving CO₂ and silica out of the anion load.
  • Using one capacity for both resins.
  • Forgetting the water used for regeneration and rinse when sizing the plant output.

Assumptions and limits

  • Steady flow and water quality; capacities at your regeneration level; no degasser unless you have removed CO₂ from the anion load.
  • The flow is the net treated water; regeneration and rinse water are not deducted, so add them to the raw water demand.
  • No design margin, minimum bed depth or freeboard is applied. A note appears when the regenerant dose is below the stoichiometric need for the load (equivalents as CaCO₃); practical ratios are well above that, as the resin maker states.

References

  • Ion-exchange mass balance (ionic load / operating capacity)

Questions and answers

How do I size a DM plant?

Divide the ionic load per run by each resin's operating capacity. 20 m³/h for 20 hours with 300 mg/L cations and 280 mg/L anions (as CaCO₃) needs 2.4 m³ of cation resin at 50 g/L and 3.2 m³ of anion resin at 35 g/L; regeneration takes 192 kg of HCl and 224 kg of NaOH (100 %).

Should CO₂ and silica be counted?

Yes, in the anion load, unless a degasser removes the CO₂ first. Silica loads the strong-base anion resin and often sets the run end.

What about the mixed bed?

A mixed-bed polisher after the two-bed unit has a small load; size it separately for the leakage it must remove.

Method and article reviewed by FireCAD engineering on 11 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.