Worked example
Example: 20 m³/h, 20 h, cations 300, anions 280 mg/L as CaCO3. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Treated water flow (net output; regeneration and rinse water not deducted) | 20.000 m³/h |
| Run time between regenerations | 20.000 h |
| Total cations to remove, as CaCO₃ | 300.00 mg/L |
| Total anions to remove (with CO₂ and silica if no degasser), as CaCO₃ | 280.00 mg/L |
| Cation resin operating capacity, as CaCO₃ | 50.000 g/L |
| Anion resin operating capacity, as CaCO₃ | 35.000 g/L |
| Acid dose per litre of cation resin (as 100 % HCl) | 80.000 g/L |
| Caustic dose per litre of anion resin (as 100 % NaOH) | 70.000 g/L |
Applying the formula below gives:
| Result | Value |
|---|---|
| Cation resin volume | 2,400.0 L |
| Anion resin volume | 3,200.0 L |
| Acid per regeneration (100 % HCl) | 192.00 kg |
| Caustic per regeneration (100 % NaOH) | 224.00 kg |
| Water treated per run | 400.00 m³ |
Open this example in the calculator and change any input.
Formula
\(V_w = \dot V\,t_r \qquad V_c = \frac{V_w\,C_c}{Q_c} \qquad V_a = \frac{V_w\,C_a}{Q_a} \qquad m_{HCl} = V_c\,d_{HCl} \qquad m_{NaOH} = V_a\,d_{NaOH}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\dot V\) | treated water flow (net output) | m³/s |
| \(t_r\) | run time | s |
| \(C_c\) | total cations as CaCO₃ | kg/m³ |
| \(C_a\) | total anions as CaCO₃ | kg/m³ |
| \(Q_c\) | cation resin operating capacity | kg/m³ |
| \(Q_a\) | anion resin operating capacity | kg/m³ |
| \(d_{HCl}\) | acid dose per volume of cation resin | kg/m³ |
| \(d_{NaOH}\) | caustic dose per volume of anion resin | kg/m³ |
| \(V_c\) | cation resin volume | m³ |
| \(V_a\) | anion resin volume | m³ |
| \(m_{HCl}\) | acid per regeneration (100 %) | kg |
| \(m_{NaOH}\) | caustic per regeneration (100 %) | kg |
| \(V_w\) | water treated per run | m³ |
Method and standards
Mass balance of each ion-exchange bed; capacities and regenerant doses are the resin maker's data for your water and regeneration level.
Where it is used
- Sizing DM plants for high-pressure boiler make-up.
- Estimating acid and caustic consumption.
- Checking run length after a change in raw water or RO pre-treatment.
Common mistakes
- Leaving CO₂ and silica out of the anion load.
- Using one capacity for both resins.
- Forgetting the water used for regeneration and rinse when sizing the plant output.
Assumptions and limits
- Steady flow and water quality; capacities at your regeneration level; no degasser unless you have removed CO₂ from the anion load.
- The flow is the net treated water; regeneration and rinse water are not deducted, so add them to the raw water demand.
- No design margin, minimum bed depth or freeboard is applied. A note appears when the regenerant dose is below the stoichiometric need for the load (equivalents as CaCO₃); practical ratios are well above that, as the resin maker states.
References
- Ion-exchange mass balance (ionic load / operating capacity)
Questions and answers
How do I size a DM plant?
Divide the ionic load per run by each resin's operating capacity. 20 m³/h for 20 hours with 300 mg/L cations and 280 mg/L anions (as CaCO₃) needs 2.4 m³ of cation resin at 50 g/L and 3.2 m³ of anion resin at 35 g/L; regeneration takes 192 kg of HCl and 224 kg of NaOH (100 %).
Should CO₂ and silica be counted?
Yes, in the anion load, unless a degasser removes the CO₂ first. Silica loads the strong-base anion resin and often sets the run end.
What about the mixed bed?
A mixed-bed polisher after the two-bed unit has a small load; size it separately for the leakage it must remove.
Method and article reviewed by FireCAD engineering on 11 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.