Boiler Water Recovery after a Contamination Upset

Concentration in boiler water over time after an upset as blowdown dilutes it toward the normal level (first-order mixing), and the time to reach a target.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationDistillery and ethanolBoiler

Inputs

Examples: 40 t hold-up, 2 t/h blowdownSmall boiler

Any units: mg/L TDS, ppb Na, µS/cm.

Results

Time constant M/ṁ_b16.000h
Concentration at the check time2,329.0
Time to reach the target19.264h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 40 t hold-up, 2 t/h blowdown. The inputs, in the units selected above:

InputValue
Boiler water hold-up40.000 t
Blowdown flow (raised during recovery)2,000.0 kg/h
Concentration after the upset800.00 -
Normal steady level at this blowdown150.00 -
Target level300.00 -
Time for a check value6.0000 h

Applying the formula below gives:

ResultValue
Time constant M/ṁ_b20.000 h
Concentration at the check time631.53
Time to reach the target29.327 h

Open this example in the calculator and change any input.

Formula

\(\tau = \frac{M}{\dot m_b}, \quad c(t) = c_{ss} + (c_0 - c_{ss})e^{-t/\tau}, \quad t_t = \tau\ln\frac{c_0 - c_{ss}}{c_t - c_{ss}}\)

Variables

Symbol Meaning SI unit
\(M\) Boiler water hold-up kg
\(\dot m_b\) Blowdown flow (raised during recovery) kg/s
\(c_0\) Concentration after the upset -
\(c_{ss}\) Normal steady level at this blowdown -
\(c_t\) Target level -
\(t\) Time for a check value s
\(\tau\) Time constant M/ṁ_b s
\(c(t)\) Concentration at the check time -
\(t_t\) Time to reach the target s

Method and standards

First-order mixing.

Where it is used

  • Sugar ingress and condenser leak recovery.

Common mistakes

  • Using normal blowdown for the recovery period.

Assumptions and limits

  • Fully mixed boiler water.
  • The steady level must be the level that the raised blowdown rate gives (it is lower than at normal blowdown); it is your input and is not checked against the flow.
  • When the target is not between the upset and steady levels, the time to it is not shown and a note says why.

References

  • Completely mixed tank with blowdown: c(t) = c_ss + (c₀ − c_ss) e^{−t ṁ_b/M}

Questions and answers

Why exponential?

Each kilogram blown down removes water at the current concentration, so the excess falls by a constant share per hour.

Speed it up?

Raise blowdown: the time constant is hold-up divided by blowdown flow.

Is the contaminant still coming in?

Then the steady level rises; stop the source first.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.