Worked example
Example: Illustrative 180 t U from 0.2 % ore. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Natural uranium needed | 180.00 t |
| Ore grade (U₃O₈ by mass) | 0.20000 % |
| Mill recovery | 90.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| U₃O₈ to uranium mass ratio | 1.1792 |
| U₃O₈ produced | 212.26 t |
| Ore mined and milled | 117,924 t |
| Uranium recovered per tonne of ore (kg) | 1.5264 |
Open this example in the calculator and change any input.
Formula
\(\frac{m_{U_3O_8}}{m_U} = \frac{3M_U + 8M_O}{3M_U}, \quad m_{ore} = \frac{m_{U_3O_8}}{gR}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(m_U\) | Natural uranium needed | kg |
| \(g\) | Ore grade (U₃O₈ by mass) | - |
| \(R\) | Mill recovery | - |
| \(m_{U_3O_8}/m_U\) | U₃O₈ to uranium mass ratio | - |
| \(m_{U_3O_8}\) | U₃O₈ produced | kg |
| \(m_{ore}\) | Ore mined and milled | kg |
| \(m_U/m_{ore}\) | Uranium recovered per tonne of ore (kg) | - |
Method and standards
Ore balance.
Where it is used
- Fuel supply and mining studies.
- Teaching the fuel cycle.
Common mistakes
- Mixing grades in U and U₃O₈.
- Forgetting mill recovery.
Assumptions and limits
- Natural uranium; mass basis.
References
- Uranium front-end mass balance
Questions and answers
How much ore feeds a reactor for a year?
About 180 t of natural uranium for a large reactor, which at 0.2 % grade and 90 % recovery is roughly 120,000 t of ore.
What is yellowcake?
The mill product, mostly U₃O₈ (84.8 % uranium by mass), which is then converted to UF₆ for enrichment.
What do the defaults represent?
An illustrative 180 t of natural uranium from 0.2 % U₃O₈ ore with 90 % mill recovery.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Lamarsh and Baratta, Introduction to Nuclear Engineering, 3rd ed. (Prentice Hall, 2001), ch. 4