FireCADCalc

Optimum Cutting Speed for Minimum Cost and Maximum Production

Tool life and cutting speed for minimum cost per part and for maximum production rate from Taylor's constants, machine rate, tool cost and change time.

Inputs

Examples: Carbide insertsHSS tool

Results

Run between the two speeds (the 'high-efficiency range').

Tool life for minimum cost297.50min
Speed for minimum cost29.442m/min
Tool life for maximum production35.000min
Speed for maximum production38.472m/min

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Carbide inserts. The inputs, in the units selected above:

InputValue
Taylor exponent0.25000 -
Taylor constant: cutting speed for a 1-minute tool life400.00 m/min
Machine and labour cost per minute15.000 -
Tool cost per cutting edge120.00 -
Tool change time2.0000 min

Applying the formula below gives:

ResultValue
Tool life for minimum cost30.000 min
Speed for minimum cost170.91 m/min
Tool life for maximum production6.0000 min
Speed for maximum production255.58 m/min

Open this example in the calculator and change any input.

Formula

\(T_{cost} = \left(\frac{1}{n} - 1\right)\left(t_c + \frac{C_t}{C_o}\right), \quad T_{prod} = \left(\frac{1}{n} - 1\right)t_c, \quad V = \frac{C}{T^n}\)

Variables

Symbol Meaning SI unit
\(n\) Taylor exponent -
\(C\) Taylor constant: cutting speed for a 1-minute tool life m/s
\(C_o\) Machine and labour cost per minute -
\(C_t\) Tool cost per cutting edge -
\(t_c\) Tool change time s
\(T_{cost}\) Tool life for minimum cost s
\(V_{cost}\) Speed for minimum cost m/s
\(T_{prod}\) Tool life for maximum production s
\(V_{prod}\) Speed for maximum production m/s

Method and standards

Gilbert.

Where it is used

  • Setting CNC speeds.
  • Tooling decisions.

Common mistakes

  • Cost per edge vs per insert.
  • Times in seconds with constants in minutes.

Assumptions and limits

  • Taylor law holds, V Tⁿ = C with T in minutes: C is the cutting speed for a 1-minute tool life (enter it in any speed unit; a constant fitted with T in seconds must be converted first, C_min = C_s × 60ⁿ).
  • The tool change time must be above zero: with zero the maximum-production speed is unbounded.

References

  • Machining economics (Gilbert): T_cost = (1/n − 1)(t_c + C_t/C_o)
  • T_prod = (1/n − 1)t_c (Kalpakjian; Groover)

Questions and answers

n 0.25, C 400, 15 per min, tool 120, 2 min change?

Minimum cost at T = 30 min, 171 m/min; maximum production at T = 6 min, 256 m/min.

Why is the production speed higher?

It ignores tool cost and only weighs change time.

Cheap inserts?

Lower tool cost pushes the economic speed up.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.