FireCADCalc

Heating Boiler Size for a Building

Boiler capacity for a building from design heat loss, hot-water load, distribution losses and a pick-up margin, and the size of each boiler for duty-sharing or N+1.

Thermal power plantProcess steam and utilitiesRefinery and petrochemicalChemical and fertiliserPulp and paperFood, dairy and textile

Inputs

Examples: 150 + 30 kW, two boilers sharing600 kW, three boilers N+1

Results

Where a DHW store has priority, the DHW load can often be left out of the peak. Oversizing beyond this costs efficiency through cycling; modulating condensing boilers suit part load.

Total boiler capacity217.35kW
Capacity of each boiler108.67kW
Installed capacity217.35kW

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 150 + 30 kW, two boilers sharing. The inputs, in the units selected above:

InputValue
Design space heat loss150.00 kW
Domestic hot water load (simultaneous)30.000 kW
Distribution losses5.0000 %
Pick-up (warm-up) margin15.000 %
Number of boilers2.0000 -
ArrangementLoad shared by all

Applying the formula below gives:

ResultValue
Total boiler capacity217.35 kW
Capacity of each boiler108.67 kW
Installed capacity217.35 kW

Open this example in the calculator and change any input.

Formula

\(Q_b = (Q_h + Q_{dhw})(1 + f_d)(1 + f_p), \quad Q_1 = \frac{Q_b}{n}\ \text{or}\ \frac{Q_b}{n - 1}\)

Variables

Symbol Meaning SI unit
\(Q_h\) Design space heat loss W
\(Q_{dhw}\) Domestic hot water load (simultaneous) W
\(f_d\) Distribution losses -
\(f_p\) Pick-up (warm-up) margin -
\(n\) Number of boilers -
\(\text{arrangement}\) Arrangement -
\(Q_b\) Total boiler capacity W
\(Q_1\) Capacity of each boiler W
\(Q_{inst}\) Installed capacity W

Method and standards

Load summation.

Where it is used

  • New and replacement boiler plant.
  • Standby planning.

Common mistakes

  • Adding margins on margins.
  • Sizing to connected radiator ratings instead of heat loss.

Assumptions and limits

  • Peak loads coincident.
  • The distribution and pick-up margins are compounded (multiplied), (1 + f_d)(1 + f_p), which is slightly larger than adding them.

References

  • Load summation with margins (CIBSE Guide B1 approach)

Questions and answers

Why add a pick-up margin?

Intermittently heated buildings need extra output to warm up in a reasonable time after night set-back.

Why two or more boilers?

Part load is most of the season; several modules keep each boiler loaded efficiently and give standby.

What do the defaults represent?

A medium building with a hot-water load and two boilers sharing the load.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.