BOD and COD Load and Organic Loading Rate

Daily BOD and COD loads of a wastewater stream from the flow and concentrations, the volumetric organic loading rate on a reactor, and the COD/BOD ratio.

Refinery and petrochemicalChemical and fertiliserPulp and paperFood, dairy and textile

Inputs

Examples: 500 m³/d, BOD 300, COD 600 mg/L, 250 m³ tankDairy 120 m³/d, BOD 1 500, COD 2 800, 400 m³Sewage 2 MLD, BOD 200, COD 450, 1 500 m³

Results

BOD load Q × BOD400.00kg/d
COD load Q × COD900.00kg/d
Organic loading rate (BOD) on the volume0.26667kg/(m³·d)
Organic loading rate (COD) on the volume0.60000kg/(m³·d)
COD to BOD ratio2.2500

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 500 m³/d, BOD 300, COD 600 mg/L, 250 m³ tank. The inputs, in the units selected above:

InputValue
Wastewater flow500.00 m³/d
BOD concentration300.00 mg/L
COD concentration600.00 mg/L
Reactor (tank) volume250.00 m³

Applying the formula below gives:

ResultValue
BOD load Q × BOD150.00 kg/d
COD load Q × COD300.00 kg/d
Organic loading rate (BOD) on the volume0.60000 kg/(m³·d)
Organic loading rate (COD) on the volume1.2000 kg/(m³·d)
COD to BOD ratio2.0000

Open this example in the calculator and change any input.

Formula

\(L = Q\, C, \quad OLR = \frac{L}{V}\)

Variables

Symbol Meaning SI unit
\(Q\) Wastewater flow m³/s
\(BOD\) BOD concentration kg/m³
\(COD\) COD concentration kg/m³
\(V\) Reactor (tank) volume m³
\(L_{BOD}\) BOD load Q × BOD kg/s
\(L_{COD}\) COD load Q × COD kg/s
\(OLR_{BOD}\) Organic loading rate (BOD) on the volume kg/(m³·s)
\(OLR_{COD}\) Organic loading rate (COD) on the volume kg/(m³·s)
\(COD/BOD\) COD to BOD ratio -

Method and standards

Mass flow equals flow times concentration.

Where it is used

  • ETP and STP design.
  • Consent applications.
  • Plant monitoring.

Common mistakes

  • Unit slips between mg/L and kg/m³.
  • Using peak flow with average concentration.

Assumptions and limits

  • Average values.

References

  • Metcalf & Eddy
  • Wastewater Engineering (load = flow × concentration)

Questions and answers

What load does 500 m³/d at BOD 300 mg/L carry?

150 kg BOD per day (300 kg COD at 600 mg/L); on a 250 m³ tank, 0.6 kg BOD/(m³·d).

Why is mg/L × m³/d ÷ 1000 kg/d?

1 mg/L = 1 g/m³.

What does COD/BOD tell?

Around 2 suggests biodegradable waste; much higher means hard-to-treat organics.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.