Worked example
Example: 1000 m2 roof. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Catchment area | 1,000.0 m² |
| Runoff coefficient | 85.000 % |
| Design storm rainfall depth | 50.000 mm |
| Storm duration | 2.0000 h |
| Infiltration rate of the soil | 15.000 mm/h |
| Infiltrating area of the pit (base and sides) | 12.000 m² |
Applying the formula below gives:
| Result | Value |
|---|---|
| Runoff volume | 42.500 m³ |
| Infiltrated during the storm | 0.36000 m³ |
| Pit storage needed | 42.140 m³ |
| Drain-down time after the storm | 234.11 h |
Open this example in the calculator and change any input.
Formula
\(V_r = C A R, \quad V_p = V_r - k A_b t_s, \quad t_d = \frac{V_p}{k A_b}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(A\) | Catchment area | m² |
| \(C\) | Runoff coefficient | - |
| \(R\) | Design storm rainfall depth | m |
| \(t_s\) | Storm duration | s |
| \(k\) | Infiltration rate of the soil | m/s |
| \(A_b\) | Infiltrating area of the pit (base and sides) | m² |
| \(V_r\) | Runoff volume | m³ |
| \(V_i\) | Infiltrated during the storm | m³ |
| \(V_p\) | Pit storage needed | m³ |
| \(t_d\) | Drain-down time after the storm | s |
Method and standards
Water balance.
Where it is used
- Plant and township rainwater harvesting.
- Statutory recharge requirements.
Common mistakes
- Rainfall intensity used as depth.
- Ignoring clogging.
Assumptions and limits
- Uniform infiltration; with zero infiltration no drain-down time is shown.
References
- Runoff V = C A R; storage = runoff − infiltration k A_b t
Questions and answers
1000 m² roof, 50 mm storm in 2 h, soil 15 mm/h, 12 m² pit area?
Runoff 42.5 m³; pit about 42.1 m³, draining in 234 h.
Gravel fill?
Divide by its porosity (about 0.35–0.4) for the pit size.
Clay soils?
Very low infiltration: recharge pits do little there.
Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.