Worked example
Example: Hammer mill 4 mm to 0.8 mm. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Bond work index (per metric tonne) | 12.000 kWh/t |
| Feed 80 % passing size | 4.0000 mm |
| Product 80 % passing size | 0.80000 mm |
| Throughput | 12.000 t/h |
Applying the formula below gives:
| Result | Value |
|---|---|
| Specific energy | 2.3453 kWh/t |
| Mill power | 28.143 kW |
Open this example in the calculator and change any input.
Formula
\(W = 10\,W_i\left(\frac{1}{\sqrt{P_{80}}} - \frac{1}{\sqrt{F_{80}}}\right)\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(W_i\) | Bond work index | J/kg |
| \(F_{80}\) | Feed 80 % passing size | m |
| \(P_{80}\) | Product 80 % passing size | m |
| \(\dot m\) | Throughput | kg/s |
| \(W\) | Specific energy | J/kg |
| \(P\) | Mill power | W |
Method and standards
Bond's law.
Where it is used
- Grain and coal mill sizing.
- Energy audits.
Common mistakes
- Sizes in mm in the formula.
Assumptions and limits
- Sizes in µm.
- The work index is per metric tonne; Bond's original values are per short ton and must be multiplied by 1.1023. The default 12 kWh/t has no particular source; Bond's law was built for ores, so back-calculate the index from your own mill.
References
- Bond (1952) W = 10 W_i (1/√P₈₀ − 1/√F₈₀)
- sizes in µm
Questions and answers
Why the square root?
Bond's third theory makes energy proportional to new crack length, scaling with 1/√size.
Work index for grain?
Not tabulated reliably: back-calculate from a mill's measured power and sizes.
Finer is better?
Finer flour raises starch conversion but costs power and can hamper separation.