Worked example
Example: Illustrative DN 100 line, 4 m lift. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Suction pipe inside diameter | 102.30 mm |
| Suction pipe length | 8.0000 m |
| Air volume in the pump casing | 5.0000 L |
| Static suction lift | 4.0000 m |
| Air-handling capacity of the pump while priming | 25.000 m³/h |
| Atmospheric pressure | 1.0132 bar |
| Liquid density | 998.00 kg/m³ |
Applying the formula below gives:
| Result | Value |
|---|---|
| Air volume to evacuate | 70.755 L |
| Pressure needed at the pump to lift the liquid | 0.62177 bar |
| Priming time | 4.9757 s |
Open this example in the calculator and change any input.
Formula
\(t = \frac{V}{S}\ln\frac{p_a}{p_a - \rho g h_s}, \quad V = \frac{\pi d^2}{4}L + V_c\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(d\) | Suction pipe inside diameter | m |
| \(L\) | Suction pipe length | m |
| \(V_c\) | Air volume in the pump casing | m³ |
| \(h_s\) | Static suction lift | m |
| \(S\) | Air-handling capacity of the pump while priming | m³/s |
| \(p_a\) | Atmospheric pressure | Pa |
| \(\rho\) | Liquid density | kg/m³ |
| \(V\) | Air volume to evacuate | m³ |
| \(p_e\) | Pressure needed at the pump to lift the liquid | Pa |
| \(t\) | Priming time | s |
Method and standards
Priming time.
Where it is used
- Selecting self-priming pumps for sumps and tankers.
- Checking priming of long suction lines.
Common mistakes
- Ignoring the casing and fittings volume.
- Using the liquid capacity instead of the air-handling capacity.
Assumptions and limits
- Isothermal air; constant air-handling capacity; no leaks.
References
- Isothermal evacuation of a fixed volume
Questions and answers
How long does a self-priming pump take to prime?
For the defaults, a 4 m lift through 8 m of DN 100 pipe with 25 m³/h of air handling takes about 5 s.
Why does my pump not prime?
Usually an air leak in the suction line or the seal, or a lift too high for the vapour pressure of the liquid.
What do the defaults represent?
An illustrative DN 100 suction line 8 m long, 4 m lift, 5 L casing air and 25 m³/h air handling.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Karassik, Messina, Cooper and Heald, Pump Handbook, 4th ed. (McGraw-Hill, 2008)