Worked example
Example: Illustrative 60 L/min pump. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Pump flow | 60.000 L/min |
| Maximum pump starts per hour | 15.000 - |
| Cut-in pressure (gauge) | 2.0000 bar |
| Cut-out pressure (gauge) | 3.5000 bar |
| Precharge pressure (gauge, empty tank) | 1.8000 bar |
| Atmospheric pressure | 1.0132 bar |
Applying the formula below gives:
| Result | Value |
|---|---|
| Drawdown volume needed | 60.000 L |
| Drawdown factor (share of tank volume) | 31.030 % |
| Total tank volume | 193.36 L |
| Minimum cycle time | 4.0000 min |
Open this example in the calculator and change any input.
Formula
\(V_d = \frac{\dot V}{4N}, \quad f_d = p_0\left(\frac{1}{p_{on}} - \frac{1}{p_{off}}\right), \quad V = \frac{V_d}{f_d}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\dot V\) | Pump flow | m³/s |
| \(N\) | Maximum pump starts per hour | - |
| \(p_{on}\) | Cut-in pressure (gauge) | Pa |
| \(p_{off}\) | Cut-out pressure (gauge) | Pa |
| \(p_0\) | Precharge pressure (gauge, empty tank) | Pa |
| \(p_a\) | Atmospheric pressure | Pa |
| \(V_d\) | Drawdown volume needed | m³ |
| \(f_d\) | Drawdown factor (share of tank volume) | - |
| \(V\) | Total tank volume | m³ |
| \(t_c\) | Minimum cycle time | s |
Method and standards
Pressure tank.
Where it is used
- Booster sets, borewells and domestic water systems.
- Reducing pump cycling.
Common mistakes
- Using gauge instead of absolute pressures.
- Precharging above the cut-in pressure.
Assumptions and limits
- Isothermal gas; bladder tank.
References
- Boyle's law drawdown and pump-cycling criterion
Questions and answers
How big a pressure tank does a 60 L/min pump need?
For 15 starts an hour and 2.0–3.5 bar, about 190 litres total (60 L drawdown).
Why does the tank hold so little water?
Only the air compression between cut-in and cut-out pressures pushes water out: typically a quarter to a third of the tank.
What do the defaults represent?
An illustrative 60 L/min pump with 2.0 bar cut-in, 3.5 bar cut-out, 1.8 bar precharge and at most 15 starts per hour.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.