Worked example
Example: 5 m³, 250 m³/h, atmosphere to 10 mbar; 10 min wanted. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Volume of the vessel and piping | 5.0000 m³ |
| Effective pumping speed at the vessel | 250.00 m³/h |
| Starting pressure (absolute) | 1,013.2 mbar |
| Target pressure (absolute) | 10.000 mbar |
| Time wanted (for the speed needed) | 10.000 min |
Applying the formula below gives:
| Result | Value |
|---|---|
| Pump-down time (V/S) ln(p₁/p₂) | 5.5420 min |
| Pumping speed needed for the time wanted | 138.55 m³/h |
Open this example in the calculator and change any input.
Formula
\(t = \frac{V}{S}\ln\frac{p_1}{p_2}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(V\) | Volume of the vessel and piping | m³ |
| \(S\) | Effective pumping speed at the vessel | m³/s |
| \(p_1\) | Starting pressure (absolute) | Pa |
| \(p_2\) | Target pressure (absolute) | Pa |
| \(t_w\) | Time wanted (for the speed needed) | s |
| \(t\) | Pump-down time (V/S) ln(p₁/p₂) | s |
| \(S_{req}\) | Pumping speed needed for the time wanted | m³/s |
Method and standards
Mass balance with constant volumetric speed.
Where it is used
- Vacuum dryers, condensers and evaporators.
- Pump selection.
Common mistakes
- Pump nameplate speed instead of effective speed.
- Ignoring leakage.
Assumptions and limits
Valid in the rough vacuum range (down to about 1 mbar); the page warns for lower targets, where outgassing and leakage set the time.
Rough vacuum, no gas load.
References
- Pump-down equation for constant pumping speed (vacuum technology texts)
Questions and answers
5 m³ from atmospheric to 10 mbar with 250 m³/h?
5.5 minutes.
Why logarithmic?
Each pass removes the same share of the remaining gas.
Why does it take longer in practice?
Leaks, outgassing and falling pump speed at low pressure.