Worked example
Example: Illustrative 10 m3/h borehole airlift. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Water flow to lift | 10.000 m³/h |
| Lift above the water level | 6.0000 m |
| Submergence of the air injection point | 12.000 m |
| Airlift efficiency | 40.000 % |
| Atmospheric pressure | 101.33 kPa |
| Water density | 998.00 kg/m³ |
Applying the formula below gives:
| Result | Value |
|---|---|
| Submergence ratio H_s/(H_s + H_L) | 66.667 % |
| Air pressure needed at injection (gauge) | 117.44 kPa |
| Free air flow | 18.824 m³/h |
| Air-to-water ratio | 1.8824 |
| Isothermal air power | 0.40779 kW |
Open this example in the calculator and change any input.
Formula
\(p_aV_a\ln\frac{p_a + \rho gH_s}{p_a} = \frac{\rho gQ_wH_L}{\eta}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(Q_w\) | Water flow to lift | m³/s |
| \(H_L\) | Lift above the water level | m |
| \(H_s\) | Submergence of the air injection point | m |
| \(\eta\) | Airlift efficiency | - |
| \(p_a\) | Atmospheric pressure | Pa |
| \(\rho\) | Water density | kg/m³ |
| \(s\) | Submergence ratio H_s/(H_s + H_L) | - |
| \(p_g\) | Air pressure needed at injection (gauge) | Pa |
| \(\dot V_a\) | Free air flow | m³/s |
| \(\dot V_a/Q_w\) | Air-to-water ratio | - |
| \(P_a\) | Isothermal air power | W |
Method and standards
Airlift pump.
Where it is used
- Borehole development, aquaculture and wastewater sludge.
- Estimating compressor size for airlifts.
Common mistakes
- Ignoring that efficiency depends on submergence.
- Quoting compressed instead of free air.
Assumptions and limits
- Isothermal expansion; efficiency from experience; steady flow.
References
- Airlift pump energy balance (isothermal expansion)
Questions and answers
What submergence is needed?
Usually 55–70 % of the total length (submergence plus lift) for reasonable efficiency.
Why is the efficiency low?
Slip between air and water and friction in the two-phase riser waste much of the expansion work.
What do the defaults represent?
An illustrative 10 m³/h borehole airlift lifting 6 m with 12 m submergence at 40 % efficiency.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Karassik, Messina, Cooper and Heald, Pump Handbook, 4th ed. (McGraw-Hill, 2008)