Worked example
Example: Illustrative 600 mm pipe, 3 m sand and gravel. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Unit weight of the backfill | 18.800 kN/m³ |
| Cover depth to the top of the pipe | 3.0000 m |
| Trench width at the top of the pipe | 1.2000 m |
| Pipe outside diameter | 600.00 mm |
| Backfill type (product of Rankine ratio and friction) | Sand and gravel (0.165) |
Applying the formula below gives:
| Result | Value |
|---|---|
| Load coefficient | 1.7023 |
| Load on a rigid pipe | 46.085 kN/m |
| Load on a flexible pipe (soil well compacted at the sides) | 23.043 kN/m |
| Weight of the soil prism over the pipe | 33.840 kN/m |
Open this example in the calculator and change any input.
Formula
\(W = C_d\,w\,B_d^2, \quad C_d = \frac{1 - e^{-2K\mu' H/B_d}}{2K\mu'}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(w\) | Unit weight of the backfill | N/m³ |
| \(H\) | Cover depth to the top of the pipe | m |
| \(B_d\) | Trench width at the top of the pipe | m |
| \(B_c\) | Pipe outside diameter | m |
| \(K\mu'\) | Backfill type (product of Rankine ratio and friction) | - |
| \(C_d\) | Load coefficient | - |
| \(W_r\) | Load on a rigid pipe | N/m |
| \(W_f\) | Load on a flexible pipe (soil well compacted at the sides) | N/m |
| \(W_p\) | Weight of the soil prism over the pipe | N/m |
Method and standards
Marston load.
Where it is used
- Design of buried water, sewer and cooling-water pipes.
- Checking trench width for a given pipe.
Common mistakes
- Using the trench width at the surface instead of at the top of the pipe.
- Using the trench formula for an embankment installation.
Assumptions and limits
- Trench condition; no live load or surcharge; settled backfill.
References
- Marston–Spangler trench-condition load theory
Questions and answers
Why is the load less than the soil prism weight?
The settling backfill hangs on the trench walls through friction, carrying part of its own weight.
Why keep the trench narrow?
The load on a rigid pipe grows with the square of the trench width at the top of the pipe.
What do the defaults represent?
An illustrative 600 mm pipe under 3 m of sand and gravel backfill (18.8 kN/m³) in a 1.2 m trench.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Moody and Spangler: Marston load theory for buried conduits (Spangler and Handy, Soil Engineering, 4th ed., Harper and Row, 1982)