Example: Illustrative 6 in water-filled span. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Pipe outside diameter | 168.30 mm |
| Wall thickness | 7.1100 mm |
| Span length | 6.0000 m |
| Elastic modulus | 200.00 GPa |
| Pipe material density | 7,850.0 kg/m³ |
| Contents density | 1,000.0 kg/m³ |
| Insulation and cladding mass per metre | 8.0000 kg/m |
| End condition | Simply supported (π²) |
Applying the formula below gives:
| Result | Value |
|---|---|
| Second moment of area | 1,171.6 cm⁴ |
| Mass per metre | 54.909 kg/m |
| First natural frequency | 9.0137 Hz |
| Span for a 4 Hz first frequency | 9.0068 m |
Open this example in the calculator and change any input.
Formula
\(f_1 = \frac{\lambda^2}{2\pi L^2}\sqrt{\frac{EI}{m}}, \quad \lambda^2 = \pi^2,\ 15.42,\ 22.37\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(D\) | Pipe outside diameter | m |
| \(t\) | Wall thickness | m |
| \(L\) | Span length | m |
| \(E\) | Elastic modulus | Pa |
| \(\rho_s\) | Pipe material density | kg/m³ |
| \(\rho_f\) | Contents density | kg/m³ |
| \(m_i\) | Insulation and cladding mass per metre | kg/m |
| \(\text{ends}\) | End condition | - |
| \(I\) | Second moment of area | m⁴ |
| \(m\) | Mass per metre | kg/m |
| \(f_n\) | First natural frequency | 1/s |
| \(L_{4Hz}\) | Span for a 4 Hz first frequency | m |
Method and standards
Pipe span frequency.
Where it is used
- Pump and compressor piping.
- Small-bore connection vibration screening.
Common mistakes
- Forgetting the contents and insulation mass.
- Assuming fixed ends for ordinary supports.
Assumptions and limits
- Uniform straight span; supports rigid vertically.
References
- Euler–Bernoulli beam natural frequency with standard end constants
Questions and answers
What frequency does a 6 m span of 6 in water-filled pipe have?
About 9 Hz with simply supported ends.
Why 4 Hz?
It keeps spans stiff enough to avoid large movements from low-frequency flow and wind excitation; check against machine speeds too.
What do the defaults represent?
An illustrative 6 in schedule 40 steel pipe, water-filled, 8 kg/m of insulation, on a 6 m simply supported span.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Nayyar, Piping Handbook, 7th ed. (McGraw-Hill, 2000)