Backwash flow and water volume for a sand or multimedia filter from bed area, backwash rate and duration, with the share of filtered water used.

Refinery and petrochemicalChemical and fertiliserPulp and paperFood, dairy and textile

Inputs

Examples: 30 m2 sand filterPressure filter 7 m2

From the media supplier for the media and temperature.

Results

Add air scour and rinse-to-waste water if your filters use them.

Backwash flow210.00m³/h
Water per wash28.000m³
Water filtered per run1,008.0m³
Share of filtered water used for washing2.7778%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 30 m2 sand filter. The inputs, in the units selected above:

InputValue
Filter bed area30.000 m²
Backwash rate40.000 m/h
Backwash duration10.000 min
Filtration rate10.000 m/h
Filter run between washes24.000 h

Applying the formula below gives:

ResultValue
Backwash flow1,200.0 m³/h
Water per wash200.00 m³
Water filtered per run7,200.0 m³
Share of filtered water used for washing2.7778 %

Open this example in the calculator and change any input.

Formula

\(\dot V_b = A v_b, \quad V_b = \dot V_b t_b, \quad x = \frac{V_b}{A v_f t_r}\)

Variables

Symbol Meaning SI unit
\(A\) Filter bed area m²
\(v_b\) Backwash rate m/s
\(t_b\) Backwash duration s
\(v_f\) Filtration rate m/s
\(t_r\) Filter run between washes s
\(\dot V_b\) Backwash flow m³/s
\(V_b\) Water per wash m³
\(V_f\) Water filtered per run m³
\(x\) Share of filtered water used for washing -

Method and standards

Volume balance.

Where it is used

  • Pre-treatment filters for DM and RO plants.
  • Backwash pump and tank sizing.

Common mistakes

  • Rate in m/h used as m/s.
  • Ignoring rinse.

Assumptions and limits

  • One filter washed at a time.
  • The share uses the gross filtrate of a run; the filter is off line during the wash and that lost output is not deducted (negligible for long runs).

References

  • Q_b = A v_b; V_b = Q_b t_b; filtered = A v_f t_r

Questions and answers

30 m² at 40 m/h for 10 min?

1200 m³/h backwash, 200 m³ per wash; 2.8 % of a day's filtrate.

Backwash tank?

Hold at least one wash, plus margin.

Cold water?

Higher viscosity expands the bed more: lower the rate.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.