Shell-and-Tube Exchanger Preliminary Size: Area, Shell and Tubes

Required area, shell diameter and number of tubes for a first shell-and-tube design from duty, overall coefficient, mean temperature difference, tube size and pitch.

Process steam and utilitiesRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: 2 MW cooler, U 600, dTm 20 K, 25 mm triangular 1.25, two passes, 6 mCondensate cooler 300 kW, U 900, dTm 15 K, 3/4 in square 1.33, four passes, 4 m

Accepted: 0.1 to 1,000,000 kW
Accepted: 10 to 10,000 W/(m²·K)
Accepted: 0.5 to 500 K
Accepted: 5 to 100 mm
Accepted: 1.15 to 2
Accepted: 0.5 to 20 m

Results

A first estimate to select a standard (TEMA) shell and tube count, which is then rated (for example by the Kern or Bell–Delaware method). C_TP allows for the tubes lost to passes and clearance.

Required outside area22.222m²
Shell diameter0.29895m
Number of tubes92.893
Tube count constant0.85000
Layout constant1.0000

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 2 MW cooler, U 600, dTm 20 K, 25 mm triangular 1.25, two passes, 6 m. The inputs, in the units selected above:

InputValue
Heat duty2,000.0 kW
Fouled overall coefficient600.00 W/(m²·K)
Mean temperature difference (F·LMTD)20.000 K
Tube outside diameter25.000 mm
Pitch ratio P_T/d_o1.2500 -
Tube layoutTriangular (C_L = 0.87)
Tube passesTwo (C_TP = 0.90)
Tube length6.0000 m

Applying the formula below gives:

ResultValue
Required outside area166.67 m²
Shell diameter0.65239 m
Number of tubes353.92
Tube count constant0.90000
Layout constant0.87000

Open this example in the calculator and change any input.

Formula

\(A_o = \frac{Q}{U_f\Delta T_m}, \quad D_s = 0.637\sqrt{\frac{C_L}{C_{TP}}}\left[\frac{A_oP_R^2d_o}{L}\right]^{1/2}, \quad N_t = 0.785\frac{C_{TP}}{C_L}\frac{D_s^2}{P_R^2d_o^2}\)

Variables

Symbol Meaning SI unit
\(Q\) Heat duty W
\(U_f\) Fouled overall coefficient W/(m²·K)
\(\Delta T_m\) Mean temperature difference (F·LMTD) K
\(d_o\) Tube outside diameter m
\(P_R\) Pitch ratio P_T/d_o -
\(\text{layout}\) Tube layout -
\(N_p\) Tube passes -
\(L\) Tube length m
\(A_o\) Required outside area m²
\(D_s\) Shell diameter m
\(N_t\) Number of tubes -
\(C_{TP}\) Tube count constant -
\(C_L\) Layout constant -

Method and standards

Geometric estimate of shell size and tube count.

Where it is used

  • First pass of a shell-and-tube design.
  • Checking proposals for plausible sizes.

Common mistakes

  • Using the clean U.
  • Forgetting the F correction in ΔT_m.

Assumptions and limits

  • Plain tubes, full bundle; the constants are approximate.

Questions and answers

Why does the tube length matter?

For a fixed area, longer tubes need fewer of them and a smaller, cheaper shell; length is usually limited by space and tube pulling room.

What do the defaults represent?

An illustrative case: 2 MW cooler, U 600, dTm 20 K, 25 mm triangular 1.25, two passes, 6 m. Replace the inputs with your own data.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Kakaç, Liu and Pramuanjaroenkij, Heat Exchangers: Selection, Rating and Thermal Design, 3rd ed. (CRC Press, 2012), sec. 9.3.1, eqs. 9.9 and 9.10 and Example 9.1

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.