Gasketed Plate Heat Exchanger: Coefficients, U and Pressure Drop

Channel velocity, film coefficients, overall coefficient against the duty's requirement, and channel and port pressure drops of a gasketed plate heat exchanger.

Process steam and utilitiesRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: Water-water 1 MW, LMTD 8 K, stainless, 2 passes of 25 channels, 150 mm ports

Accepted: 0.001 to 1,000,000 kW
Accepted: 0.5 to 300 K
Accepted: 50 to 100 %
Accepted: 0.01 to 5 m²
Accepted: 0.1 to 5 m
Accepted: 0.05 to 3 m
Accepted: 1 to 10 mm
Accepted: 1 to 1,000
Accepted: 1 to 10
Accepted: 0.1 to 3 mm
Accepted: 5 to 400 W/(m·K)
Accepted: 10 to 600 mm
Accepted: 3.6 to 36,000,000 kg/h
Accepted: 300 to 2,000 kg/m³
Accepted: 0.01 to 1,000 mPa·s
Accepted: 0.05 to 1 W/(m·K)
Accepted: 0.5 to 10,000
Accepted: 100 to 1,000,000 W/(m²·K)
Accepted: 3.6 to 36,000,000 kg/h
Accepted: 300 to 2,000 kg/m³
Accepted: 0.01 to 1,000 mPa·s
Accepted: 0.05 to 1 W/(m·K)
Accepted: 0.5 to 10,000
Accepted: 100 to 1,000,000 W/(m²·K)

Results

The general correlations Nu = 0.26 Re^0.65 Pr^0.4 and j_f = 0.60 Re^-0.3 with d_e = 2b; port losses 1.3 velocity heads per pass. Manufacturers' plate-specific correlations should be used for final design.

Number of plates101.00
Heat transfer area50.500m²
Overall coefficient required2,605.5W/(m²·K)
Stream 1 channel velocity0.65966m/s
Stream 1 Reynolds number7,619.0
Stream 1 film coefficient13,455W/(m²·K)
Stream 2 channel velocity0.65437m/s
Stream 2 Reynolds number4,571.4
Stream 2 film coefficient11,617W/(m²·K)
Overall coefficient (with fouling)2,874.4W/(m²·K)
Margin over the requirement10.318%
Stream 1 pressure drop (channels + ports)0.26690bar
Stream 2 pressure drop (channels + ports)0.30463bar

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Water-water 1 MW, LMTD 8 K, stainless, 2 passes of 25 channels, 150 mm ports. The inputs, in the units selected above:

InputValue
Duty1,000.0 kW
Log mean temperature difference8.0000 K
Correction factor for the pass arrangement95.000 %
Effective area of one plate0.50000 m²
Effective plate length1.2000 m
Effective plate width0.42000 m
Plate spacing (channel gap)3.5000 mm
Channels per pass25.000 -
Passes2.0000 -
Plate thickness0.60000 mm
Plate conductivity (titanium 21, stainless 16)16.000 W/(m·K)
Port diameter150.00 mm
Stream 1 flow86,400 kg/h
Stream 1 density990.00 kg/m³
Stream 1 viscosity0.60000 mPa·s
Stream 1 conductivity0.63000 W/(m·K)
Stream 1 Prandtl number3.9000 -
Stream 1 fouling coefficient20,000 W/(m²·K)
Stream 2 flow86,400 kg/h
Stream 2 density998.00 kg/m³
Stream 2 viscosity1.0000 mPa·s
Stream 2 conductivity0.60000 W/(m·K)
Stream 2 Prandtl number7.0000 -
Stream 2 fouling coefficient10,000 W/(m²·K)

Applying the formula below gives:

ResultValue
Number of plates101.00
Heat transfer area50.500 m²
Overall coefficient required2,605.5 W/(m²·K)
Stream 1 channel velocity0.65966 m/s
Stream 1 Reynolds number7,619.0
Stream 1 film coefficient13,455 W/(m²·K)
Stream 2 channel velocity0.65437 m/s
Stream 2 Reynolds number4,571.4
Stream 2 film coefficient11,617 W/(m²·K)
Overall coefficient (with fouling)2,874.4 W/(m²·K)
Margin over the requirement10.318 %
Stream 1 pressure drop (channels + ports)0.26690 bar
Stream 2 pressure drop (channels + ports)0.30463 bar

Open this example in the calculator and change any input.

Formula

\(\frac{h_pd_e}{k_f} = 0.26\,Re^{0.65}Pr^{0.4}, \quad d_e = 2b, \quad j_f = 0.60\,Re^{-0.3}\)

\(\Delta P_p = 8j_f\frac{L_pN_p}{d_e}\frac{\rho u_p^2}{2} + 1.3N_p\frac{\rho u_{pt}^2}{2}, \quad \frac{1}{U} = \frac{1}{h_1} + \frac{1}{h_{f1}} + \frac{t_p}{k_p} + \frac{1}{h_2} + \frac{1}{h_{f2}}\)

Variables

Symbol Meaning SI unit
\(Q\) Duty W
\(\Delta T_{lm}\) Log mean temperature difference K
\(F_t\) Correction factor for the pass arrangement -
\(A_p\) Effective area of one plate m²
\(L_p\) Effective plate length m
\(w\) Effective plate width m
\(b\) Plate spacing (channel gap) m
\(N_c\) Channels per pass -
\(N_p\) Passes -
\(t_p\) Plate thickness m
\(k_p\) Plate conductivity (titanium 21, stainless 16) W/(m·K)
\(d_{port}\) Port diameter m
\(\dot m_1\) Stream 1 flow kg/s
\(\rho_1\) Stream 1 density kg/m³
\(\mu_1\) Stream 1 viscosity Pa·s
\(k_1\) Stream 1 conductivity W/(m·K)
\(Pr_1\) Stream 1 Prandtl number -
\(h_{f,1}\) Stream 1 fouling coefficient W/(m²·K)
\(\dot m_2\) Stream 2 flow kg/s
\(\rho_2\) Stream 2 density kg/m³
\(\mu_2\) Stream 2 viscosity Pa·s
\(k_2\) Stream 2 conductivity W/(m·K)
\(Pr_2\) Stream 2 Prandtl number -
\(h_{f,2}\) Stream 2 fouling coefficient W/(m²·K)
\(N\) Number of plates -
\(A\) Heat transfer area m²
\(U_{req}\) Overall coefficient required W/(m²·K)
\(u_1\) Stream 1 channel velocity m/s
\(Re_1\) Stream 1 Reynolds number -
\(h_1\) Stream 1 film coefficient W/(m²·K)
\(u_2\) Stream 2 channel velocity m/s
\(Re_2\) Stream 2 Reynolds number -
\(h_2\) Stream 2 film coefficient W/(m²·K)
\(U\) Overall coefficient (with fouling) W/(m²·K)
\(U/U_{req} - 1\) Margin over the requirement -
\(\Delta P_1\) Stream 1 pressure drop (channels + ports) Pa
\(\Delta P_2\) Stream 2 pressure drop (channels + ports) Pa

Method and standards

Generalised plate heat exchanger correlations for preliminary design.

Where it is used

  • Comparing a plate exchanger with shell-and-tube for a duty.
  • Checking plate counts in vendor offers.

Common mistakes

  • Using the gap as the hydraulic diameter (it is 2b).
  • Forgetting port pressure losses.

Assumptions and limits

  • Chevron plates with typical geometry; single-phase duties.

Questions and answers

Why are the plate counts odd?

N plates make N − 1 channels; with end plates, 2N_cN_p + 1 plates give N_c channels per pass for each stream.

Why are port pressure drops so large?

All the flow passes through the port.13 shows water port losses twice the channel loss, cured by bigger ports.

What do the defaults represent?

An illustrative case: Water-water 1 MW, LMTD 8 K, stainless, 2 passes of 25 channels, 150 mm ports. Replace the inputs with your own data.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Sinnott, Coulson and Richardson's Chemical Engineering Vol. 6: Chemical Engineering Design, 4th ed. (Elsevier, 2005), sec. 12.12, eqs. 12.77 to 12.79 and Example 12.13

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.