Worked example
Example: 80 MW coal boiler: 600 m³, 700 m² EPRS, 50 m² plan. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Heat input from fuel (GCV or NCV: quote the same basis as the limit) | 80.000 MW |
| Furnace volume | 600.00 m³ |
| Effective projected radiant surface | 700.00 m² |
| Furnace plan (cross-section) area | 50.000 m² |
Applying the formula below gives:
| Result | Value |
|---|---|
| Volumetric heat release | 133.33 kW/m³ |
| Heat release per EPRS | 114.29 kW/m² |
| Heat release per plan area | 1.6000 MW/m² |
Open this example in the calculator and change any input.
Formula
\(q_V = \frac{\dot Q}{V} \qquad q_A = \frac{\dot Q}{A_{EPRS}} \qquad q_P = \frac{\dot Q}{A_p}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\dot Q\) | heat input from fuel | W |
| \(V\) | furnace volume | m³ |
| \(A_{EPRS}\) | effective projected radiant surface | m² |
| \(A_p\) | furnace plan area | m² |
| \(q_V\) | volumetric heat release | W/m³ |
| \(q_A\) | heat release per EPRS | W/m² |
| \(q_P\) | heat release per plan area | W/m² |
Method and standards
Definitions of furnace heat loading. Allowable values depend on fuel and firing system and come from the boiler maker or design standard; none are built in.
Where it is used
- Checking a furnace design or a fuel change.
- Comparing boiler offers.
- Explaining slagging or high furnace exit temperature.
Common mistakes
- Mixing GCV and NCV heat input.
- Using furnace volume measured to a different boundary than the limit assumes.
- Comparing figures between fuels with different limits.
Assumptions and limits
- Uniform definitions; the boundary of volume and EPRS as you measure it.
- The results are on the calorific basis of the heat input you enter; compare them only with limits on the same basis.
References
- Definitions of furnace heat loading (heat input per volume and per area)
Questions and answers
What is furnace heat release rate?
Heat input divided by furnace volume or surface. 80 MW into a 600 m³ furnace with 700 m² EPRS and 50 m² plan area is 133 kW/m³, 114 kW/m² and 1.6 MW/m².
Which figure matters most?
Plan area loading for slagging coals, EPRS loading for furnace exit temperature and tube heat flux, volume for residence time. Boiler makers check all three against limits for the fuel.
Is it on GCV or NCV?
Either, but say which: limits are quoted on one basis, often the gross heat input.
Method and article reviewed by FireCAD engineering on 11 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.