Furnace Heat Release Rate (Volume, Area, Plan)

Furnace volumetric heat release, heat release per unit of effective projected radiant surface and per unit of plan area, from the firing rate and furnace size.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationPulp and paperFood, dairy and textileBoilerBurner and furnace

Inputs

Examples: 80 MW coal boiler: 600 m³, 700 m² EPRS, 50 m² planOil-fired 25 MW: 90 m³, 160 m², 14 m²Bagasse 60 MW: 800 m³, 850 m², 60 m²

Results

Compare with the design limits for your fuel and firing system from the boiler maker or your design standard.

Volumetric heat release133.33kW/m³
Heat release per EPRS114.29kW/m²
Heat release per plan area1.6000MW/m²

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 80 MW coal boiler: 600 m³, 700 m² EPRS, 50 m² plan. The inputs, in the units selected above:

InputValue
Heat input from fuel (GCV or NCV: quote the same basis as the limit)80.000 MW
Furnace volume600.00 m³
Effective projected radiant surface700.00 m²
Furnace plan (cross-section) area50.000 m²

Applying the formula below gives:

ResultValue
Volumetric heat release133.33 kW/m³
Heat release per EPRS114.29 kW/m²
Heat release per plan area1.6000 MW/m²

Open this example in the calculator and change any input.

Formula

\(q_V = \frac{\dot Q}{V} \qquad q_A = \frac{\dot Q}{A_{EPRS}} \qquad q_P = \frac{\dot Q}{A_p}\)

Variables

Symbol Meaning SI unit
\(\dot Q\) heat input from fuel W
\(V\) furnace volume m³
\(A_{EPRS}\) effective projected radiant surface m²
\(A_p\) furnace plan area m²
\(q_V\) volumetric heat release W/m³
\(q_A\) heat release per EPRS W/m²
\(q_P\) heat release per plan area W/m²

Method and standards

Definitions of furnace heat loading. Allowable values depend on fuel and firing system and come from the boiler maker or design standard; none are built in.

Where it is used

  • Checking a furnace design or a fuel change.
  • Comparing boiler offers.
  • Explaining slagging or high furnace exit temperature.

Common mistakes

  • Mixing GCV and NCV heat input.
  • Using furnace volume measured to a different boundary than the limit assumes.
  • Comparing figures between fuels with different limits.

Assumptions and limits

  • Uniform definitions; the boundary of volume and EPRS as you measure it.
  • The results are on the calorific basis of the heat input you enter; compare them only with limits on the same basis.

References

  • Definitions of furnace heat loading (heat input per volume and per area)

Questions and answers

What is furnace heat release rate?

Heat input divided by furnace volume or surface. 80 MW into a 600 m³ furnace with 700 m² EPRS and 50 m² plan area is 133 kW/m³, 114 kW/m² and 1.6 MW/m².

Which figure matters most?

Plan area loading for slagging coals, EPRS loading for furnace exit temperature and tube heat flux, volume for residence time. Boiler makers check all three against limits for the fuel.

Is it on GCV or NCV?

Either, but say which: limits are quoted on one basis, often the gross heat input.

Method and article reviewed by FireCAD engineering on 11 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.