Worked example
Example: A strike 60 t. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Massecuite per strike | 60.000 t |
| Feed (syrup or molasses) brix | 65.000 % |
| Massecuite brix | 92.000 % |
| Pan pressure (absolute) | 16.000 kPa |
| Heating steam or vapour pressure (absolute) | 1.8000 bar |
| Heat losses and sensible heat allowance | 5.0000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Feed per strike | 84.923 t |
| Water evaporated per strike | 24.923 t |
| Steam or vapour per strike | 28.044 t |
Open this example in the calculator and change any input.
Formula
\(M_f = M_m \frac{Bx_m}{Bx_f}, \quad E = M_f - M_m, \quad M_s = \frac{E\,h_{fg}(p_p)(1 + k_l)}{h_{fg}(p_s)}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(M_m\) | Massecuite per strike | kg |
| \(Bx_f\) | Feed (syrup or molasses) brix | - |
| \(Bx_m\) | Massecuite brix | - |
| \(p_p\) | Pan pressure (absolute) | Pa |
| \(p_s\) | Heating steam or vapour pressure (absolute) | Pa |
| \(k_l\) | Heat losses and sensible heat allowance | - |
| \(M_f\) | Feed per strike | kg |
| \(E\) | Water evaporated per strike | kg |
| \(M_s\) | Steam or vapour per strike | kg |
Method and standards
Solids and energy balance.
Where it is used
- Pan station steam balance.
- Choosing syrup brix.
Common mistakes
- Massecuite volume used as mass.
Assumptions and limits
- Feed at boiling point.
- The whole strike is built from feed (no footing share; see the pan boiling time calculator for that).
- The steam must be at a higher pressure than the pan, but the useful temperature difference after the massecuite's boiling-point rise and head is not checked.
References
- Solids balance and energy balance with IAPWS-IF97 latent heats
Questions and answers
Why boil under vacuum?
Low temperature limits sucrose inversion and colour formation.
Vapour or exhaust for pans?
Vapour from the first or second effect is usual; it saves exhaust (Rillieux).
Why is feed brix important?
A higher syrup brix leaves less water for the pan to evaporate.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.