Worked example
Example: 25 t/h sugar, 50 % crystal. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Sugar from this massecuite | 25.000 t/h |
| Crystal % massecuite | 50.000 % |
| Massecuite density | 1,500.0 kg/m³ |
| Pan capacity (strike volume) | 60.000 m³ |
Applying the formula below gives:
| Result | Value |
|---|---|
| Massecuite | 50.000 t/h |
| Massecuite volume | 33.333 m³/h |
| Strikes per day | 13.333 |
Open this example in the calculator and change any input.
Formula
\(\dot m_m = \frac{\dot m_S}{c_m}, \quad \dot V_m = \frac{\dot m_m}{\rho_m}, \quad N = \frac{86400\,\dot V_m}{V_p}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\dot m_S\) | Sugar from this massecuite | kg/s |
| \(c_m\) | Crystal % massecuite | - |
| \(\rho_m\) | Massecuite density | kg/m³ |
| \(V_p\) | Pan capacity (strike volume) | m³ |
| \(\dot m_m\) | Massecuite | kg/s |
| \(\dot V_m\) | Massecuite volume | m³/s |
| \(N\) | Strikes per day | - |
Method and standards
Mass balance.
Where it is used
- Pan station capacity.
- Boiling scheme studies.
Common mistakes
- Crystal % solids used as % massecuite.
Assumptions and limits
- Steady output. The sugar is taken as dry crystal; crystal dissolved by washing in the centrifugals is not counted, so slightly more massecuite is needed in practice.
- Strikes per day are volume per day over strike volume; pan cycle time (boiling, dropping, steaming out) decides how many pans are needed.
References
- Crystal balance ṁ_m = ṁ_S/c_m; volume by density
Questions and answers
Why does crystal content matter so much?
Massecuite to boil and centrifuge varies inversely with it.
Massecuite density?
About 1.45–1.55 t/m³ for A to C massecuites.
Strikes per day?
Volume per day over strike volume; add boiling and dropping time for pan count.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.