Worked example
Example: Four 1.6 m3 machines. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Charge per cycle | 1.6000 m³ |
| Massecuite density | 1,500.0 kg/m³ |
| Cycles per hour | 22.000 - |
| Crystal % massecuite | 50.000 % |
| Machines in service | 4.0000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Massecuite cured | 211.20 t/h |
| Crystal in the charge (sugar discharged is a little less) | 105.60 t/h |
Open this example in the calculator and change any input.
Formula
\(\dot m_m = \frac{V_c \rho_m n_c N}{3600}, \quad \dot m_S = \dot m_m c_m\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(V_c\) | Charge per cycle | m³ |
| \(\rho_m\) | Massecuite density | kg/m³ |
| \(n_c\) | Cycles per hour | - |
| \(c_m\) | Crystal % massecuite | - |
| \(N\) | Machines in service | - |
| \(\dot m_m\) | Massecuite cured | kg/s |
| \(\dot m_S\) | Crystal in the charge (sugar discharged is a little less) | kg/s |
Method and standards
Definitions.
Where it is used
- Centrifugal station capacity.
- Season expansion.
Common mistakes
- Basket volume used for the charge.
Assumptions and limits
- Full charges.
- The sugar output is the crystal in the charge; wash water dissolves part of it, so the sugar actually discharged is a little less. No allowance is applied.
References
- Throughput = charge × density × cycles × machines; sugar by crystal content
Questions and answers
Batch or continuous?
Batch machines for A and B; continuous machines usually cure C massecuite.
What limits cycles per hour?
Acceleration, wash, spin and discharge times and the drive.
Why less sugar than crystal?
Wash water dissolves part of the crystal.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.