Worked example
Example: Illustrative 10 m3/min on 2 m3. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Receiver and system volume | 2.0000 m³ |
| Compressor free air delivery | 10.000 m³/min |
| Air demand (free air) | 6.0000 m³/min |
| Pressure band (cut-in to cut-out) | 1.0000 bar |
| Atmospheric pressure | 1.0132 bar |
| Maximum cycles per hour allowed | 30.000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Load time | 29.608 s |
| Unload time | 19.738 s |
| Cycles per hour | 72.954 |
| Load share | 60.000 % |
| Volume for the maximum cycle rate at worst demand | 5.0663 m³ |
Open this example in the calculator and change any input.
Formula
\(t_l = \frac{V\Delta p}{p_a(Q_c - Q_d)}, \quad t_u = \frac{V\Delta p}{p_aQ_d}, \quad V_{min} = \frac{p_aQ_c}{4\Delta p\,N_{max}}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(V\) | Receiver and system volume | m³ |
| \(Q_c\) | Compressor free air delivery | m³/s |
| \(Q_d\) | Air demand (free air) | m³/s |
| \(\Delta p\) | Pressure band (cut-in to cut-out) | Pa |
| \(p_a\) | Atmospheric pressure | Pa |
| \(N_{max}\) | Maximum cycles per hour allowed | - |
| \(t_l\) | Load time | s |
| \(t_u\) | Unload time | s |
| \(N\) | Cycles per hour | - |
| \(Q_d/Q_c\) | Load share | - |
| \(V_{min}\) | Volume for the maximum cycle rate at worst demand | m³ |
Method and standards
Compressor cycling.
Where it is used
- Compressed air system design.
- Energy audits of load/unload compressors.
Common mistakes
- Forgetting pipework volume.
- Using gauge for atmospheric pressure.
Assumptions and limits
- Isothermal filling; steady demand.
References
- Isothermal receiver filling and emptying
Questions and answers
How often does a 10 m³/min compressor cycle on a 2 m³ receiver at 6 m³/min demand with a 1 bar band?
About 73 cycles an hour (30 s loaded, 20 s unloaded).
What receiver keeps it below 30 cycles an hour?
About 5.1 m³ including pipework.
What do the defaults represent?
An illustrative 10 m³/min compressor with 2 m³ of receiver and pipework, 6 m³/min demand, 1 bar band, at most 30 cycles an hour.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.