Electricity Bill: Energy and Demand Charges

Monthly electricity cost from energy (kWh) and maximum demand (kVA) charges, with the average cost per kWh and the plant load factor.

Thermal power plantProcess steam and utilitiesElectric motor

Inputs

Examples: Month: 600 000 kWh, 1200 kVA demand, pf 0.95, 720 h, 7/kWh, 400/kVAMonth: 150 000 kWh, 400 kVA, 0.9, 720 h, 8, 350Month: 2 000 000 kWh, 3500 kVA, 0.98, 744 h, 6.5, 450

Results

Taxes, power-factor penalties or rebates and time-of-day rates are not included; add them from your tariff.

Total cost (your currency)1.4575e+07
Energy charge1.3000e+07
Demand charge1,575,000
Average cost per kWh7.2875
Load factor78.372%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Month: 600 000 kWh, 1200 kVA demand, pf 0.95, 720 h, 7/kWh, 400/kVA. The inputs, in the units selected above:

InputValue
Energy used in the period600,000 kWh
Maximum demand1,200.0 kVA
Average power factor95.000 %
Hours in the billing period720.00 h
Energy rate per kWh (your currency)7.0000 -
Demand rate per kVA per period (your currency)400.00 -

Applying the formula below gives:

ResultValue
Total cost (your currency)4,680,000
Energy charge4,200,000
Demand charge480,000
Average cost per kWh7.8000
Load factor73.099 %

Open this example in the calculator and change any input.

Formula

\(C_e = E\,c_e \qquad C_d = S_{md}\,c_d \qquad C = C_e + C_d \qquad \bar c = \frac{C}{E} \qquad LF = \frac{E}{S_{md}\cos\varphi\,t}\)

Variables

Symbol Meaning SI unit
\(E\) energy used J
\(S_{md}\) maximum demand VA
\(\cos\varphi\) average power factor –
\(t\) hours in the period s
\(c_e\) energy rate per kWh –
\(c_d\) demand rate per kVA –
\(C\) total cost –
\(C_e\) energy charge –
\(C_d\) demand charge –
\(\bar c\) average cost per kWh –
\(LF\) load factor –

Method and standards

Two-part tariff: energy and maximum demand charges; load factor relative to maximum demand converted to kW.

Where it is used

  • Checking utility bills.
  • Valuing power factor correction and load management.
  • Budgeting plant power.

Common mistakes

  • Using kW demand where the tariff charges kVA.
  • Ignoring contracted minimum demand.
  • Comparing average cost across tariffs.

Assumptions and limits

  • Single-rate energy and demand charges.
  • The load factor converts the maximum demand to kW with the average power factor; the power factor at the time of the peak may differ.

References

  • Two-part tariff arithmetic

Questions and answers

How is an industrial electricity bill made up?

Energy charge plus demand charge. 600 000 kWh at 7 and 1200 kVA demand at 400 cost 4.68 million, an average of 7.80 per kWh; the load factor is 73 %.

How do I lower the average cost?

Flatten the load (higher load factor), improve power factor to cut kVA demand, and shift loads off peak where the tariff rewards it.

What is not included?

Taxes, power-factor penalties or rebates and time-of-day rates.

Method and article reviewed by FireCAD engineering on 11 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.