FireCADCalc

Comminution Energy by Morrell's Mi Equation

Specific comminution energy and power by Morrell's size-dependent equation, using the Mia, Mib, Mic or Mih work index parameter from SMC and Bond tests.

Inputs

Examples: Wills Example 5.1: ball mill, Mib 18.8 kWh/t, 750 to 106 µmSAG mill, Mia 19.4 kWh/t, 150 mm to 750 µmCone crusher, Mic 7.2 kWh/t, 50 to 12 mm

Results

Use Mia for AG/SAG milling above 750 µm, Mib for ball milling below 750 µm, Mic for conventional crushers and Mih for HPGRs (Morrell, 2009). Mib comes from a Bond ball-mill test with its closing screen.

Specific energy8.3756kWh/t
Power4,187.8kW
Exponent at the feed size-0.29575
Exponent at the product size-0.29511

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Wills Example 5.1: ball mill, Mib 18.8 kWh/t, 750 to 106 µm. The inputs, in the units selected above:

InputValue
Work index parameter (Mia, Mib, Mic or Mih)18.800 kWh/t
Feed 80 % passing size750.00 µm
Product 80 % passing size106.00 µm
Throughput500.00 t/h

Applying the formula below gives:

ResultValue
Specific energy8.3756 kWh/t
Power4,187.8 kW
Exponent at the feed size-0.29575
Exponent at the product size-0.29511

Open this example in the calculator and change any input.

Formula

\(W = 4 M_i\left(P^{f(P)} - F^{f(F)}\right), \quad f(x) = -\left(0.295 + \frac{x}{10^6}\right)\ (x\ \text{in µm})\)

Variables

Symbol Meaning SI unit
\(M_i\) Work index parameter (Mia, Mib, Mic or Mih) J/kg
\(F\) Feed 80 % passing size m
\(P\) Product 80 % passing size m
\(T\) Throughput kg/s
\(W\) Specific energy J/kg
\(P_W\) Power W
\(f(F)\) Exponent at the feed size -
\(f(P)\) Exponent at the product size -

Method and standards

Morrell's energy equation.

Where it is used

  • Comparing SAG-ball, HPGR-ball and crushing circuits.
  • Geometallurgical throughput forecasts.

Common mistakes

  • Using Mib above 750 µm.
  • Mixing µm and mm sizes.

Assumptions and limits

  • Morrell's calibration database.

References

  • Wills and Finch
  • Wills' Mineral Processing Technology
  • 8th ed. (Butterworth-Heinemann, 2016)
  • ch. 5
  • eqs. 5.6-5.7 (Morrell, 2004, 2006, 2009) and Example 5.1

Questions and answers

How does it differ from Bond?

The exponent changes with particle size instead of being fixed at 0.5, which suits AG/SAG mills and HPGRs.

Where do the Mi values come from?

From the SMC Test (Mia, Mic, Mih) and a variant of the Bond ball-mill test (Mib).

What do the defaults represent?

Wills's Example 5.1: fine ball milling from 750 to 106 µm with Mib 18.8 kWh/t (8.4 kWh/t), at 500 t/h.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.