Worked example
Example: Wills Example 7.1a: SAG, 10 % balls and 30 % rock. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Ball filling (fraction of mill volume) | 10.000 % |
| Rock filling | 30.000 % |
| Voidage of the charge | 40.000 % |
| Fraction of voids filled by slurry | 100.00 % |
| Ball density | 7.8500 g/cm³ |
| Ore density | 3.0000 g/cm³ |
| Solids by volume in the slurry | 10.000 % |
| Density of the slurry solids | 3.0000 g/cm³ |
| Mill internal volume | 600.00 m³ |
Applying the formula below gives:
| Result | Value |
|---|---|
| Slurry density | 1.2000 g/cm³ |
| Apparent density of the charge | 3.0075 g/cm³ |
| Charge mass (balls, rock and slurry) | 721.80 t |
Open this example in the calculator and change any input.
Formula
\(\rho_{ap} = \frac{J_b(1 - f_v)\rho_b + J_r(1 - f_v)\rho_r + (J_b + J_r)f_v U\rho_{sl}}{J_b(1 - f_v) + J_r(1 - f_v) + (J_b + J_r)f_v U}, \quad \rho_{sl} = \phi_p\rho_p + (1 - \phi_p)\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(J_b\) | Ball filling (fraction of mill volume) | - |
| \(J_r\) | Rock filling | - |
| \(f_v\) | Voidage of the charge | - |
| \(U\) | Fraction of voids filled by slurry | - |
| \(\rho_b\) | Ball density | kg/m³ |
| \(\rho_r\) | Ore density | kg/m³ |
| \(\phi_p\) | Solids by volume in the slurry | - |
| \(\rho_p\) | Density of the slurry solids | kg/m³ |
| \(V\) | Mill internal volume | m³ |
| \(\rho_{sl}\) | Slurry density | kg/m³ |
| \(\rho_{ap}\) | Apparent density of the charge | kg/m³ |
| \(M_c\) | Charge mass (balls, rock and slurry) | kg |
Method and standards
Volume-weighted charge density.
Where it is used
- Mill power models and load monitoring.
- Bearing pressure and ball top-up planning.
Common mistakes
- Mixing total and ball filling.
- Ignoring slurry in the voids.
Assumptions and limits
- Same voidage for balls and rock.
References
- Wills and Finch
- Wills' Mineral Processing Technology
- 8th ed. (Butterworth-Heinemann, 2016)
- ch. 7
- eqs. 7.8-7.9 and Example 7.1
Questions and answers
Why does SAG power fall when rock replaces balls?
Rock is less than half as dense as steel, so the charge is lighter at the same volume; Wills's example drops from 5.19 to 3.0 t/m³.
What void filling should I use?
1.0 when slurry fills the voids of the charge; less when the mill runs with a low slurry level.
What do the defaults represent?
Wills's Example 7.1a: 10 % balls and 30 % rock, 40 % voidage filled with slurry of 10 % solids by volume (3.0 t/m³), in a 600 m³ mill.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.