FireCADCalc

Flotation Cell and Bank Volume from Retention Time

Total and per-cell flotation volume from the dry feed rate, laboratory time and scale-up factor, gas holdup, pulp solids and ore density (Wood's method).

Inputs

Examples: Wills Example 12.2: 24,000 t/d at 35 % solids, 7 cellsCopper scavengers, 92 % availabilityCleaner bank, dilute pulp

Results

Effective volume excludes the impeller, stator and internal launders; take the next standard cell size up and recheck the number of cells against the minimum bank length.

Pulp volume per tonne of solids2.1905m³/t
Plant retention time12.500min
Pulp expansion factor1.1765
Total effective bank volume536.88m³
Effective volume per cell76.697m³

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Wills Example 12.2: 24,000 t/d at 35 % solids, 7 cells. The inputs, in the units selected above:

InputValue
Dry solids feed rate1,000.0 t/h
Availability100.00 %
Laboratory flotation time5.0000 min
Scale-up factor on time (2–2.5)2.5000 -
Gas holdup (air in the pulp)15.000 %
Solids by mass in the pulp35.000 %
Ore density3.0000 g/cm³
Number of cells in the bank7.0000 -

Applying the formula below gives:

ResultValue
Pulp volume per tonne of solids2.1905 m³/t
Plant retention time12.500 min
Pulp expansion factor1.1765
Total effective bank volume536.88 m³
Effective volume per cell76.697 m³

Open this example in the calculator and change any input.

Formula

\(N V_{eff} = \frac{F T E P}{60}, \quad T = t_{lab} f_s, \quad E = \frac{1}{1 - GH}, \quad P = \frac{1}{\rho_s} + \frac{100}{x} - 1\)

Variables

Symbol Meaning SI unit
\(F\) Dry solids feed rate kg/s
\(a\) Availability -
\(t_{lab}\) Laboratory flotation time s
\(f_s\) Scale-up factor on time (2–2.5) -
\(GH\) Gas holdup (air in the pulp) -
\(x\) Solids by mass in the pulp -
\(\rho_s\) Ore density kg/m³
\(N\) Number of cells in the bank -
\(P\) Pulp volume per tonne of solids m³/kg
\(T\) Plant retention time s
\(E\) Pulp expansion factor -
\(N V_{eff}\) Total effective bank volume m³
\(V_{eff}\) Effective volume per cell m³

Method and standards

Wood's cell sizing method.

Where it is used

  • Sizing rougher, scavenger and cleaner banks.
  • Checking an existing bank for higher tonnage.

Common mistakes

  • Ignoring availability.
  • Using total cell volume as effective volume.

Assumptions and limits

  • Mixed cells; scale-up factor from experience.

References

  • Wills and Finch
  • Wills' Mineral Processing Technology
  • 8th ed. (Butterworth-Heinemann, 2016)
  • ch. 12
  • eq. 12.54 (Wood, 2002) and Example 12.2

Questions and answers

Why scale up the laboratory time?

Plant cells are mixed, have short-circuiting and a froth phase that drops recovery, so they need 2 to 2.5 times the laboratory time.

What is the expansion factor?

Air in the pulp takes volume; with 15 % gas holdup the cell holds 1/0.85 times the pulp volume.

What do the defaults represent?

Wills's Example 12.2: 24,000 t/d at 35 % solids, ore density 3, 5 minutes laboratory time × 2.5 (537 m³, about 77 m³ per cell in seven cells).

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.