Worked example
Example: 100 mm test cyclone to 380 mm plant cyclone. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Tested cyclone diameter | 10.000 cm |
| Tested flow per cyclone | 120.00 L/min |
| Tested pressure drop | 100.00 kPa |
| Tested corrected cut size | 22.000 µm |
| New cyclone diameter | 38.000 cm |
| New flow per cyclone | 1,900.0 L/min |
| Exponents | Practical (Wills): 1.54, 0.43, 0.72, 0.22, 2.0, 3.76 |
Applying the formula below gives:
| Result | Value |
|---|---|
| New corrected cut size | 52.417 µm |
| New pressure drop | 165.64 kPa |
| Diameter giving the tested cut size at the new pressure | 11.667 cm |
| Hydraulic power per cyclone | 5.2452 kW |
| Flow by Wills's approximation 9.5×10⁻³ D_c² √P | 176.55 m³/h |
Open this example in the calculator and change any input.
Formula
\(\frac{d_{50c2}}{d_{50c1}} = \left(\frac{D_{c2}}{D_{c1}}\right)^{n_1}\left(\frac{Q_1}{Q_2}\right)^{n_2}, \quad \frac{P_1}{P_2} = \left(\frac{Q_1}{Q_2}\right)^{n_5}\left(\frac{D_{c2}}{D_{c1}}\right)^{n_6}, \quad D_c^* = D_{c1}\left(\frac{P_2}{P_1}\right)^{n_4/n_3}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(D_{c1}\) | Tested cyclone diameter | m |
| \(Q_1\) | Tested flow per cyclone | m³/s |
| \(P_1\) | Tested pressure drop | Pa |
| \(d_{50c1}\) | Tested corrected cut size | m |
| \(D_{c2}\) | New cyclone diameter | m |
| \(Q_2\) | New flow per cyclone | m³/s |
| \(n_i\) | Exponents | - |
| \(d_{50c2}\) | New corrected cut size | m |
| \(P_2\) | New pressure drop | Pa |
| \(D_c^*\) | Diameter giving the tested cut size at the new pressure | m |
| \(P_2 Q_2\) | Hydraulic power per cyclone | W |
| \(Q_{app}\) | Flow by Wills's approximation 9.5×10⁻³ D_c² √P | m³/s |
Method and standards
Power-law scale-up of geometrically similar cyclones.
Where it is used
- Selecting plant cyclones from pilot tests.
- Checking the pressure for a new cyclone cluster.
Common mistakes
- Mixing total and per-cyclone flow.
- Scaling between cyclones of different geometry.
Assumptions and limits
- Geometric similarity; same slurry.
References
- Wills and Finch
- Wills' Mineral Processing Technology
- 8th ed. (Butterworth-Heinemann, 2016)
- ch. 9
- eqs. 9.24-9.27
Questions and answers
Why can't cut size be scaled on diameter alone?
A new diameter brings a new flow or pressure or both; the three must be chosen together.
Which exponents should I use?
Wills recommends the practical set for most plant slurries; the theoretical set holds for dilute laminar flow in small cyclones.
What do the defaults represent?
A 100 mm test cyclone cutting at 22 µm with 120 L/min and 100 kPa, scaled to a 380 mm cyclone taking 1,900 L/min.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.