FireCADCalc

Pump Wet-Well Volume for Allowable Starts per Hour

Minimum effective sump or wet-well volume so a constant-speed pump stays within its allowable starts per hour, with alternating pumps.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationRefinery and petrochemicalChemical and fertiliserPulp and paper

Inputs

Examples: 100 m³/h pump, 6 starts/h, 6 m² sumpTwo alternating 300 m³/h pumps, 10 starts/h

Results

Worst case is inflow equal to half the pump capacity: cycle time = 4V/Q. Alternating n pumps lets each start less often. Add volume below the stop level for submergence and above for alarms.

Minimum cycle time per pump6.0000min
Effective volume required3.7500m³
Depth between start and stop0.31250m

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 100 m³/h pump, 6 starts/h, 6 m² sump. The inputs, in the units selected above:

InputValue
Pump capacity100.00 m³/h
Allowable starts per hour6.0000 -
Pumps alternating as duty1.0000 -
Wet-well plan area6.0000 m²

Applying the formula below gives:

ResultValue
Minimum cycle time per pump10.000 min
Effective volume required4.1667 m³
Depth between start and stop0.69444 m

Open this example in the calculator and change any input.

Formula

\(T_c = \frac{3600}{Z}, \quad V = \frac{QT_c}{4n}\)

Variables

Symbol Meaning SI unit
\(Q\) Pump capacity m³/s
\(Z\) Allowable starts per hour -
\(n\) Pumps alternating as duty -
\(A\) Wet-well plan area m²
\(T_c\) Minimum cycle time per pump s
\(V\) Effective volume required m³
\(\Delta h\) Depth between start and stop m

Method and standards

Pump cycling.

Where it is used

  • Effluent, drainage and condensate sumps.
  • Raw-water intake pits.

Common mistakes

  • Sizing for average inflow.
  • Ignoring alternation.

Assumptions and limits

  • Constant-speed pumps; on/off control.

References

  • Cycle-time relation V = QT_c/4 (Sanks, Pumping Station Design, ch. 12)

Questions and answers

Why does inflow at half capacity give the shortest cycle?

Fill and empty times are equal then; their sum, the cycle time, is at its minimum.

How many starts can a motor take?

Typically 6–15 per hour depending on size; large motors fewer. Check the maker.

What do the defaults represent?

A 100 m³/h pump allowed six starts an hour in a 6 m² sump.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.