Worked example
Example: 100 m³/h pump, 6 starts/h, 6 m² sump. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Pump capacity | 100.00 m³/h |
| Allowable starts per hour | 6.0000 - |
| Pumps alternating as duty | 1.0000 - |
| Wet-well plan area | 6.0000 m² |
Applying the formula below gives:
| Result | Value |
|---|---|
| Minimum cycle time per pump | 10.000 min |
| Effective volume required | 4.1667 m³ |
| Depth between start and stop | 0.69444 m |
Open this example in the calculator and change any input.
Formula
\(T_c = \frac{3600}{Z}, \quad V = \frac{QT_c}{4n}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(Q\) | Pump capacity | m³/s |
| \(Z\) | Allowable starts per hour | - |
| \(n\) | Pumps alternating as duty | - |
| \(A\) | Wet-well plan area | m² |
| \(T_c\) | Minimum cycle time per pump | s |
| \(V\) | Effective volume required | m³ |
| \(\Delta h\) | Depth between start and stop | m |
Method and standards
Pump cycling.
Where it is used
- Effluent, drainage and condensate sumps.
- Raw-water intake pits.
Common mistakes
- Sizing for average inflow.
- Ignoring alternation.
Assumptions and limits
- Constant-speed pumps; on/off control.
References
- Cycle-time relation V = QT_c/4 (Sanks, Pumping Station Design, ch. 12)
Questions and answers
Why does inflow at half capacity give the shortest cycle?
Fill and empty times are equal then; their sum, the cycle time, is at its minimum.
How many starts can a motor take?
Typically 6–15 per hour depending on size; large motors fewer. Check the maker.
What do the defaults represent?
A 100 m³/h pump allowed six starts an hour in a 6 m² sump.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.