Bell–Delaware Method: Shell-Side Coefficient and Pressure Drop

Shell-side heat transfer coefficient and nozzle-to-nozzle pressure drop of a segmental-baffled E shell by the Bell–Delaware method with Taborek's curve fits.

Thermal power plantRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: Cooling water shell side, 0.6 m shell, 19.05 mm tubes on 23.81 mm triangular pitch, 25 % cut, larger end spacesViscous oil (laminar), rotated square, 0.45 m shell, 25.4 mm tubes on 31.75 mm pitch

Accepted: 36 to 3,600,000 kg/h
Accepted: 100 to 3,000 mm
Accepted: 2 to 200 mm
Accepted: 5 to 60 mm
Accepted: 6 to 100 mm
Accepted: 1 to 20,000
Accepted: 20 to 3,000 mm
Accepted: 20 to 5,000 mm
Accepted: 20 to 5,000 mm
Accepted: 15 to 45 %
Accepted: 1 to 500
Accepted: 0 to 20
Accepted: 0 to 3 mm
Accepted: 0 to 10 mm
Accepted: 0.001 to 1,000 mPa·s
Accepted: 0.05 to 20
Accepted: 0.5 to 10 kJ/(kg·K)
Accepted: 0.01 to 1 W/(m·K)
Accepted: 0.5 to 2,000 kg/m³

Results

Taborek's version of the Delaware method (E shell, single-segmental baffles, plain tubes).

Cross-flow area at the shell centreline0.031436m²
Fraction of tubes in cross flow63.881%
Tube-to-baffle leakage area0.011769m²
Shell-to-baffle leakage area0.002011m²
Window flow area0.024392m²
Reynolds number (tube OD, mass flux at S_m)30,300
Ideal tube bank j-factor0.005875
Ideal tube bank Fanning friction factor0.10636
Ideal tube bank coefficient10,426W/(m²·K)
Baffle window correction1.0099
Leakage correction (heat transfer)0.61376
Bypass correction (heat transfer)0.95914
Unequal spacing correction0.96107
Laminar flow correction1.0000
Product of the corrections0.57138
Shell-side heat transfer coefficient5,957.3W/(m²·K)
Tube rows crossed between baffle tips14.549
Effective rows crossed in one window5.8196
Leakage correction (pressure drop)0.40338
Bypass correction (pressure drop)0.88382
Ideal pressure drop, one baffle space4.8495kPa
Ideal pressure drop, one window5.7527kPa
Shell-side pressure drop, nozzle to nozzle (without nozzles)76.311kPa

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Cooling water shell side, 0.6 m shell, 19.05 mm tubes on 23.81 mm triangular pitch, 25 % cut, larger end spaces. The inputs, in the units selected above:

InputValue
Shell-side mass flow144,000 kg/h
Shell inside diameter600.00 mm
Diametral shell-to-bundle clearance12.000 mm
Tube outside diameter19.050 mm
Tube pitch23.810 mm
Tube layoutTriangular 30°
Number of tubes600.00 -
Central baffle spacing250.00 mm
Inlet baffle spacing400.00 mm
Outlet baffle spacing400.00 mm
Baffle cut (fraction of shell diameter)25.000 %
Number of baffles18.000 -
Pairs of sealing strips2.0000 -
Tube-to-baffle clearance (radial)0.40000 mm
Shell-to-baffle clearance (radial)1.6000 mm
Shell-side fluid viscosity0.80000 mPa·s
Viscosity ratio bulk to wall1.3000 -
Specific heat4.1800 kJ/(kg·K)
Thermal conductivity0.61000 W/(m·K)
Density996.00 kg/m³

Applying the formula below gives:

ResultValue
Cross-flow area at the shell centreline0.031436 m²
Fraction of tubes in cross flow63.881 %
Tube-to-baffle leakage area0.011769 m²
Shell-to-baffle leakage area0.002011 m²
Window flow area0.024392 m²
Reynolds number (tube OD, mass flux at S_m)30,300
Ideal tube bank j-factor0.005875
Ideal tube bank Fanning friction factor0.10636
Ideal tube bank coefficient10,426 W/(m²·K)
Baffle window correction1.0099
Leakage correction (heat transfer)0.61376
Bypass correction (heat transfer)0.95914
Unequal spacing correction0.96107
Laminar flow correction1.0000
Product of the corrections0.57138
Shell-side heat transfer coefficient5,957.3 W/(m²·K)
Tube rows crossed between baffle tips14.549
Effective rows crossed in one window5.8196
Leakage correction (pressure drop)0.40338
Bypass correction (pressure drop)0.88382
Ideal pressure drop, one baffle space4.8495 kPa
Ideal pressure drop, one window5.7527 kPa
Shell-side pressure drop, nozzle to nozzle (without nozzles)76.311 kPa

Open this example in the calculator and change any input.

Formula

\(h_o = j\,c_pG\,Pr^{-2/3}\phi\,J_cJ_LJ_BJ_RJ_S, \quad G = \dot m/S_m\)

\(\Delta P_f = \left[(n_b - 1)\Delta P_{ideal}R_B + n_b\Delta P_{w,ideal}\right]R_L + 2\Delta P_{ideal}\left(1 + \frac{N_{cw}}{N_c}\right)R_BR_S\)

\(J_L = 0.44(1 - r_s) + [1 - 0.44(1 - r_s)]e^{-2.2r_l}, \quad R_L = e^{-1.33(1 + r_s)r_l^{p}}, \quad J_B = e^{-C_J(S_b/S_m)(1 - \sqrt[3]{2r_{ss}})}\)

Variables

Symbol Meaning SI unit
\(\dot m\) Shell-side mass flow kg/s
\(D_s\) Shell inside diameter m
\(D_s - D_{otl}\) Diametral shell-to-bundle clearance m
\(D_o\) Tube outside diameter m
\(P_T\) Tube pitch m
\(\theta_{tp}\) Tube layout -
\(n_t\) Number of tubes -
\(B\) Central baffle spacing m
\(B_{in}\) Inlet baffle spacing m
\(B_{out}\) Outlet baffle spacing m
\(B_c\) Baffle cut (fraction of shell diameter) -
\(n_b\) Number of baffles -
\(N_{ss}\) Pairs of sealing strips -
\(\delta_{tb}\) Tube-to-baffle clearance (radial) m
\(\delta_{sb}\) Shell-to-baffle clearance (radial) m
\(\mu\) Shell-side fluid viscosity Pa·s
\(\mu/\mu_w\) Viscosity ratio bulk to wall -
\(c_p\) Specific heat J/(kg·K)
\(k\) Thermal conductivity W/(m·K)
\(\rho\) Density kg/m³
\(S_m\) Cross-flow area at the shell centreline m²
\(F_c\) Fraction of tubes in cross flow -
\(S_{tb}\) Tube-to-baffle leakage area m²
\(S_{sb}\) Shell-to-baffle leakage area m²
\(S_w\) Window flow area m²
\(Re\) Reynolds number (tube OD, mass flux at S_m) -
\(j\) Ideal tube bank j-factor -
\(f\) Ideal tube bank Fanning friction factor -
\(h_{ideal}\) Ideal tube bank coefficient W/(m²·K)
\(J_c\) Baffle window correction -
\(J_L\) Leakage correction (heat transfer) -
\(J_B\) Bypass correction (heat transfer) -
\(J_S\) Unequal spacing correction -
\(J_R\) Laminar flow correction -
\(\Pi J\) Product of the corrections -
\(h_o\) Shell-side heat transfer coefficient W/(m²·K)
\(N_c\) Tube rows crossed between baffle tips -
\(N_{cw}\) Effective rows crossed in one window -
\(R_L\) Leakage correction (pressure drop) -
\(R_B\) Bypass correction (pressure drop) -
\(\Delta P_{ideal}\) Ideal pressure drop, one baffle space Pa
\(\Delta P_{w,ideal}\) Ideal pressure drop, one window Pa
\(\Delta P_f\) Shell-side pressure drop, nozzle to nozzle (without nozzles) Pa

Method and standards

Ideal tube bank correlations corrected for window flow, leakage, bypass, laminar flow and unequal end spacing.

Where it is used

  • Rating shell-and-tube exchangers more accurately than Kern's method.
  • Checking a vendor's shell-side film coefficient and pressure drop.
  • Judging the effect of sealing strips, clearances and baffle spacing.

Common mistakes

  • Entering diametral clearances where radial ones are asked for.
  • Using the equivalent diameter in Re instead of the tube OD.
  • Forgetting the end spaces, which have no leakage correction.

Assumptions and limits

  • E shells with single-segmental baffles and plain tubes; baffle cuts 15–45 %.
  • Accuracy about ±25 % for h_o and ±40 % for ΔP (Taborek).

Questions and answers

Which correction matters most?

Usually leakage (J_L, R_L), then bypass (J_B, R_B). Sealing strips cut the bypass; a larger baffle spacing reduces the leakage share.

How do I estimate the clearances?

(after Taborek): tube-to-baffle 0.4 mm, or 0.2 mm for tubes up to 1.25 in with an unsupported length over 0.9 m; shell-to-baffle 0.8 + 0.002 D_s mm; shell-to-bundle from the head type (about 10–20 mm for fixed tubesheets and U-tubes, 30–100 mm for floating heads).

What do the defaults represent?

An illustrative case: Cooling water shell side, 0.6 m shell, 19.05 mm tubes on 23.81 mm triangular pitch, 25 % cut, larger end spaces. Replace the inputs with your own data.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Serth, Process Heat Transfer: Principles and Applications (Academic Press, 2007), ch. 6, eqs. 6.1 to 6.57, Table 6.1 and Example 6.1 (Taborek's version of the Delaware method, Heat Exchanger Design Handbook)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.