Pan Station Volume for A, B and C Massecuites

Pan volume needed for each massecuite from the crush, massecuite volume per tonne cane and the cycle time, and the station total per t cane/h (Hugot ch. 33).

Sugar mill and cogenerationTank and drum

Inputs

Examples: 100 TCH three-massecuite250 TCH

Results

Hugot: raw sugar factories install about 1.6–1.7 m³ of pans per t cane/h. That installed figure also covers footings, seed and grain strikes, which this working-volume estimate does not include, so a lower result is expected.

A pans120.31m³
B pans68.750m³
C pans91.575m³
Total280.64m³
Pan volume per t cane/h (m³ per t/h)1.1225m³

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 100 TCH three-massecuite. The inputs, in the units selected above:

InputValue
Crushing rate100.00 t/h
A massecuite per tonne cane95.000 L/t
B massecuite per tonne cane50.000 L/t
C massecuite per tonne cane37.000 L/t
A cycle time4.0000 h
B cycle time5.0000 h
C cycle time8.0000 h
Margin1.1500 -

Applying the formula below gives:

ResultValue
A pans43.700 m³
B pans28.750 m³
C pans34.040 m³
Total106.49 m³
Pan volume per t cane/h (m³ per t/h)1.0649 m³

Open this example in the calculator and change any input.

Formula

\(V_i = A\,v_i\,t_i\,k, \quad V = V_A + V_B + V_C\)

Variables

Symbol Meaning SI unit
\(A\) Crushing rate kg/s
\(v_A\) A massecuite per tonne cane m³/kg
\(v_B\) B massecuite per tonne cane m³/kg
\(v_C\) C massecuite per tonne cane m³/kg
\(t_A\) A cycle time s
\(t_B\) B cycle time s
\(t_C\) C cycle time s
\(k\) Margin -
\(V_A\) A pans m³
\(V_B\) B pans m³
\(V_C\) C pans m³
\(V\) Total m³
\(V/A\) Pan volume per t cane/h (m³ per t/h) m³

Method and standards

Throughput times residence.

Where it is used

  • Pan station sizing.
  • Checking a station after an expansion.

Common mistakes

  • Using boiling time without auxiliary time.
  • Massecuite per t cane in kg instead of litres.

Assumptions and limits

  • Steady crush; continuous use of pans.
  • Footing, seed and graining strikes are not included; Hugot's installed 1.6–1.7 m³ per t cane/h covers them, so the result here is lower.
  • V/A is the station volume in m³ for each tonne of cane per hour.

References

  • Hugot
  • Handbook of Cane Sugar Engineering
  • 3rd ed. (Elsevier, 1986)
  • ch. 33
  • pan capacity and boiling times (Table 33.12 and pp. 669–675)

Questions and answers

Why the cycle and not just boiling time?

Each strike also needs filling, graining, steaming out and dropping; the pan is busy for the whole cycle.

Where do the L/t cane figures come from?

From the boiling scheme; Hugot's Table 33.12 gives typical values for two-, three- and four-massecuite schemes.

What margin?

A reserve for stoppages and peaks, 10–20 %.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.