Worked example
Example: 100 TCH three-massecuite. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Crushing rate | 100.00 t/h |
| A massecuite per tonne cane | 95.000 L/t |
| B massecuite per tonne cane | 50.000 L/t |
| C massecuite per tonne cane | 37.000 L/t |
| A cycle time | 4.0000 h |
| B cycle time | 5.0000 h |
| C cycle time | 8.0000 h |
| Margin | 1.1500 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| A pans | 43.700 m³ |
| B pans | 28.750 m³ |
| C pans | 34.040 m³ |
| Total | 106.49 m³ |
| Pan volume per t cane/h (m³ per t/h) | 1.0649 m³ |
Open this example in the calculator and change any input.
Formula
\(V_i = A\,v_i\,t_i\,k, \quad V = V_A + V_B + V_C\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(A\) | Crushing rate | kg/s |
| \(v_A\) | A massecuite per tonne cane | m³/kg |
| \(v_B\) | B massecuite per tonne cane | m³/kg |
| \(v_C\) | C massecuite per tonne cane | m³/kg |
| \(t_A\) | A cycle time | s |
| \(t_B\) | B cycle time | s |
| \(t_C\) | C cycle time | s |
| \(k\) | Margin | - |
| \(V_A\) | A pans | m³ |
| \(V_B\) | B pans | m³ |
| \(V_C\) | C pans | m³ |
| \(V\) | Total | m³ |
| \(V/A\) | Pan volume per t cane/h (m³ per t/h) | m³ |
Method and standards
Throughput times residence.
Where it is used
- Pan station sizing.
- Checking a station after an expansion.
Common mistakes
- Using boiling time without auxiliary time.
- Massecuite per t cane in kg instead of litres.
Assumptions and limits
- Steady crush; continuous use of pans.
- Footing, seed and graining strikes are not included; Hugot's installed 1.6–1.7 m³ per t cane/h covers them, so the result here is lower.
- V/A is the station volume in m³ for each tonne of cane per hour.
References
- Hugot
- Handbook of Cane Sugar Engineering
- 3rd ed. (Elsevier, 1986)
- ch. 33
- pan capacity and boiling times (Table 33.12 and pp. 669–675)
Questions and answers
Why the cycle and not just boiling time?
Each strike also needs filling, graining, steaming out and dropping; the pan is busy for the whole cycle.
Where do the L/t cane figures come from?
From the boiling scheme; Hugot's Table 33.12 gives typical values for two-, three- and four-massecuite schemes.
What margin?
A reserve for stoppages and peaks, 10–20 %.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.