FireCADCalc

Pan Strike: Evaporation, Boiling Time and Strikes per Day

Water a pan evaporates in a strike from feed and massecuite brix and footing, the boiling time at a rate per m² (Hugot Table 33.7) and strikes per day.

Sugar mill and cogeneration

Inputs

Examples: A strike 30 m3C strike

Hugot Table 33.7 (South Africa, adopted): footings 79, A 59, B 49, C 39 kg/(m²·h).

Results

Hugot's boiling times: A 2.5–3 h, B 3–4 h, C 4–8 h; the rate falls through the strike as the level rises.

Movement and wash water added during boiling are not included: they lengthen the boiling time.

Massecuite mass60.000t
Water evaporated11.440t
Boiling time1.4667h
Cycle time2.9667h
Strikes per day8.0899

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: A strike 30 m3. The inputs, in the units selected above:

InputValue
Massecuite volume of the strike30.000 m³
Massecuite density1,470.0 kg/m³
Massecuite brix93.000 %
Feed (syrup or molasses) brix65.000 %
Share of the strike that is footing30.000 %
Heating surface180.00 m²
Mean evaporation rate59.000 kg/(m²·h)
Other time per cycle (fill, steam out, drop)1.0000 h

Applying the formula below gives:

ResultValue
Massecuite mass44.100 t
Water evaporated13.298 t
Boiling time1.2522 h
Cycle time2.2522 h
Strikes per day10.656

Open this example in the calculator and change any input.

Formula

\(M_m = \rho_m V, \quad E = (1 - \phi)M_m\left(\frac{B_m}{B_f} - 1\right), \quad t_b = \frac{E}{g S}, \quad n = \frac{24\ \mathrm h}{t_b + t_a}\)

Variables

Symbol Meaning SI unit
\(V\) Massecuite volume of the strike m³
\(\rho_m\) Massecuite density kg/m³
\(B_m\) Massecuite brix -
\(B_f\) Feed (syrup or molasses) brix -
\(\phi\) Share of the strike that is footing -
\(S\) Heating surface m²
\(g\) Mean evaporation rate kg/(m²·s)
\(t_a\) Other time per cycle (fill, steam out, drop) s
\(M_m\) Massecuite mass kg
\(E\) Water evaporated kg
\(t_b\) Boiling time s
\(t_c\) Cycle time s
\(n\) Strikes per day -

Method and standards

Solids balance and Hugot's mean rates.

Where it is used

  • Planning pan stations.
  • Checking pan performance.

Common mistakes

  • Using the footing brix as feed brix.
  • Using peak instead of mean rates.

Assumptions and limits

  • Feed and massecuite brix steady through the strike.
  • Movement water and wash water added during boiling are not counted in E; they add evaporation, so the boiling time can be longer than shown.

References

  • Hugot
  • Handbook of Cane Sugar Engineering
  • 3rd ed. (Elsevier, 1986)
  • ch. 33
  • evaporation in pans (Table 33.7) and boiling times
  • pp. 660–675

Questions and answers

Why does the footing reduce evaporation?

The footing is already massecuite; only the rest of the strike is built from feed that must be concentrated.

Why do C strikes take so long?

Low-purity liquor is viscous, circulates slowly and evaporates at a third of the rate of footings.

Is the rate constant?

No: Hugot shows it falling from over 100 to about 20 kg/(m²·h) as the strike rises; use a mean.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.