FireCADCalc

Generator (DG Set) kVA Sizing from Load

Generator kVA rating needed for a running load from its kW and power factor, a growth margin and the planned loading, with the kW rating and full-load current.

Thermal power plantProcess steam and utilities

Inputs

Examples: 400 kW at 0.85, 10 % margin, 80 % loading120 kW at 0.7 (alternator governs)1.2 MW at 0.9, no margin, 85 % loading, 11 kV

Results

The set must cover both the kVA and the kW (engine) demand; the larger governs. Motor starting can need more: check the starting kVA against the maker's data.

Load in kVA171.43kVA
Generator rating needed257.14kVA
kW rating at the generator's power factor205.71kW
Full-load current of that rating357.74A

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 400 kW at 0.85, 10 % margin, 80 % loading. The inputs, in the units selected above:

InputValue
Running load400.00 kW
Power factor of the load0.85000 -
Margin for growth10.000 %
Planned loading of the set80.000 %
Rated power factor of the generator0.80000 -
Voltage (three phase, line to line)415.00 V

Applying the formula below gives:

ResultValue
Load in kVA470.59 kVA
Generator rating needed687.50 kVA
kW rating at the generator's power factor550.00 kW
Full-load current of that rating956.45 A

Open this example in the calculator and change any input.

Formula

\(S_L = \frac{P}{\cos\varphi}, \quad S_g = \max\left(\frac{S_L (1 + m)}{k_L},\ \frac{P (1 + m)}{k_L \cos\varphi_g}\right)\)

Variables

Symbol Meaning SI unit
\(P\) Running load W
\(\cos\varphi\) Power factor of the load -
\(m\) Margin for growth -
\(k_L\) Planned loading of the set -
\(\cos\varphi_g\) Rated power factor of the generator -
\(V\) Voltage (three phase, line to line) V
\(S_L\) Load in kVA VA
\(S_g\) Generator rating needed VA
\(P_g\) kW rating at the generator's power factor W
\(I_g\) Full-load current of that rating A

Method and standards

Alternator kVA and engine kW limits.

Where it is used

  • Standby and prime power selection.
  • Checking an existing set against added load.

Common mistakes

  • Sizing on kW alone.
  • Ignoring starting kVA.

Assumptions and limits

  • Steady load; no step-load or harmonic derating.
  • No site derating for altitude or ambient temperature (apply the maker's factors) and no motor-starting kVA check.

References

  • S = P / cos φ; rating by kVA and by engine kW

Questions and answers

What generator for 400 kW at 0.85 power factor, 10 % margin, 80 % loading?

Load 471 kVA; by kW the engine needs 688 kVA at 0.8, which governs.

Why two checks?

The alternator limits kVA; the engine limits kW.

What about motor starting?

A large DOL motor can need several times its running kVA; ask the maker.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.