FireCADCalc

Transformer kVA Sizing from a Load List

Transformer kVA for a plant from the connected load, demand factor, growth margin, power factor and planned loading, with the secondary full-load current.

Thermal power plantProcess steam and utilitiesElectric motor

Inputs

Examples: Boiler house 1200 kW connected, DF 0.7, 20 % growth, pf 0.85, 80 % loading, 415 VPlant 3000 kW, 0.6, 15 %, 0.9, 85 %, 433 VSmall 400 kW, 0.8, 25 %, 0.85, 80 %, 415 V

Multiplies the connected load. A diversity factor (1 or more) divides instead: enter its reciprocal.

Results

Choose the next standard rating above this; check the largest motor's starting dip with the motor starting calculator.

Transformer rating needed1,482.4kVA
Maximum demand1,008.0kW
Secondary full-load current at that rating2,062.3A

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Boiler house 1200 kW connected, DF 0.7, 20 % growth, pf 0.85, 80 % loading, 415 V. The inputs, in the units selected above:

InputValue
Total connected load1,200.0 kW
Demand factor (maximum demand ÷ connected load, at most 1)70.000 %
Margin for future load20.000 %
Average power factor85.000 %
Planned maximum transformer loading80.000 %
Secondary line voltage415.00 V

Applying the formula below gives:

ResultValue
Transformer rating needed1,482.4 kVA
Maximum demand1,008.0 kW
Secondary full-load current at that rating2,062.3 A

Open this example in the calculator and change any input.

Formula

\(P_d = P_c \cdot DF\,(1 + g) \qquad S = \frac{P_d}{\cos\varphi\,\lambda} \qquad I = \frac{S}{\sqrt{3}\,V}\)

Variables

Symbol Meaning SI unit
\(P_c\) connected load W
\(DF\) demand factor (maximum demand ÷ connected load) –
\(g\) growth margin –
\(\cos\varphi\) power factor –
\(\lambda\) planned loading –
\(V\) secondary line voltage V
\(S\) rating needed VA
\(P_d\) maximum demand W
\(I\) secondary full-load current A

Method and standards

Maximum demand from connected load and demand factor with a growth margin; rating from power factor and planned loading.

Where it is used

  • Sizing plant and boiler-house transformers.
  • Checking an existing transformer for added load.
  • Budget estimates.

Common mistakes

  • Counting standby motors in the demand.
  • Forgetting harmonic derating with many VFDs.
  • Ignoring the largest motor's starting dip.

Assumptions and limits

  • DF is a demand factor (at most 1, multiplies the connected load). A diversity factor is its counterpart of 1 or more and divides; enter 1/diversity here.

  • The method is the definition of maximum demand from a demand factor; the planned loading of 75–85 % and demand factors of 0.6–0.8 quoted in the FAQ are common practice ranges, not values from a standard. Use figures from your own load list.

  • Balanced load; demand factor from the load list.

References

  • Maximum demand with demand factor and margin

Questions and answers

What size transformer does my plant need?

1200 kW connected with a 0.7 demand factor and 20 % growth is 1008 kW maximum demand; at 0.85 power factor and 80 % planned loading the transformer needs 1482 kVA, so the next standard size up.

Why not size for 100 % loading?

Margin for hot weather, harmonics and future load; 75–85 % planned loading is common.

What demand factor should I use?

From your load list: running loads at their duty, standby units excluded; boiler houses often fall between 0.6 and 0.8.

Method and article reviewed by FireCAD engineering on 11 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.