Worked example
Example: Boiler house 1200 kW connected, DF 0.7, 20 % growth, pf 0.85, 80 % loading, 415 V. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Total connected load | 1,200.0 kW |
| Demand factor (maximum demand ÷ connected load, at most 1) | 70.000 % |
| Margin for future load | 20.000 % |
| Average power factor | 85.000 % |
| Planned maximum transformer loading | 80.000 % |
| Secondary line voltage | 415.00 V |
Applying the formula below gives:
| Result | Value |
|---|---|
| Transformer rating needed | 1,482.4 kVA |
| Maximum demand | 1,008.0 kW |
| Secondary full-load current at that rating | 2,062.3 A |
Open this example in the calculator and change any input.
Formula
\(P_d = P_c \cdot DF\,(1 + g) \qquad S = \frac{P_d}{\cos\varphi\,\lambda} \qquad I = \frac{S}{\sqrt{3}\,V}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(P_c\) | connected load | W |
| \(DF\) | demand factor (maximum demand ÷ connected load) | – |
| \(g\) | growth margin | – |
| \(\cos\varphi\) | power factor | – |
| \(\lambda\) | planned loading | – |
| \(V\) | secondary line voltage | V |
| \(S\) | rating needed | VA |
| \(P_d\) | maximum demand | W |
| \(I\) | secondary full-load current | A |
Method and standards
Maximum demand from connected load and demand factor with a growth margin; rating from power factor and planned loading.
Where it is used
- Sizing plant and boiler-house transformers.
- Checking an existing transformer for added load.
- Budget estimates.
Common mistakes
- Counting standby motors in the demand.
- Forgetting harmonic derating with many VFDs.
- Ignoring the largest motor's starting dip.
Assumptions and limits
DF is a demand factor (at most 1, multiplies the connected load). A diversity factor is its counterpart of 1 or more and divides; enter 1/diversity here.
The method is the definition of maximum demand from a demand factor; the planned loading of 75–85 % and demand factors of 0.6–0.8 quoted in the FAQ are common practice ranges, not values from a standard. Use figures from your own load list.
Balanced load; demand factor from the load list.
References
- Maximum demand with demand factor and margin
Questions and answers
What size transformer does my plant need?
1200 kW connected with a 0.7 demand factor and 20 % growth is 1008 kW maximum demand; at 0.85 power factor and 80 % planned loading the transformer needs 1482 kVA, so the next standard size up.
Why not size for 100 % loading?
Margin for hot weather, harmonics and future load; 75–85 % planned loading is common.
What demand factor should I use?
From your load list: running loads at their duty, standby units excluded; boiler houses often fall between 0.6 and 0.8.
Method and article reviewed by FireCAD engineering on 11 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.